工程总承包项目合同结算主要难点及处理建议
彭桂平 朱晓枫 潘建锋 李洪涛
(华信咨询设计研究院有限公司,浙江 杭州 310052)
文献要素
摘要:工程总承包项目的合同因其综合性和复杂性经常会引起合同结算争议进而影响项目的顺利实施和收尾,本文梳理工程总承包项目合同结算过程中关于合同总价审定、合同工期认定、材料价差调整、设计变更等方面存在的问题,并提出相应的处理建议,旨在为工程总承包项目的招投标、合同签订和合同结算提供参考。
关键词:工程总承包;固定总价;设计变更
Abstract:The EPC contracts often lead to disputes during contract settlement due to their comprehensiveness and complexity,which can affect the smooth implementation and completion of the project. This article reviews issues related to the determination of the total contract price,the recognition of the contract duration,material adjustments,and design changes during the contract settlement process of EPC projects,and provides corresponding handling suggestions. The aim is to offer references for the bidding,contract signing,and contract settlement of EPC projects.
Keywords:EPC;fixed total price;design changes
参考文献
[1] 彭桂平,戴彤,方锦标,等.工程总承包合同计价模式研究[J].建筑经济,2021(5):21-24.
建筑经济,2025(9):21-23
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!