轨道交通工程矩形顶管补充定额编制研究
郭超红
(广州市道路工程研究中心,广东 广州 510330)
文献要素
摘要:矩形顶管工法由于施工高效、安全、施工影响小等特点,在城市轨道交通项目中逐步得到广泛应用,而广东省轨道交通项目现有相关定额中无矩形顶管相关定额。以广州地铁十一号线矩形顶管施工为例,通过写实记录法收集顶管现场施工数据,汇总分析顶管工程定额人材机消耗量数据,编制顶管补充定额,为广东省城市轨道交通项目概预算编制、招投标编制等计价工程提供参考依据。
关键词:广东省;城市轨道交通;顶管工程;工程造价;补充定额
Abstract:Rectangular jacking method has been widely used in urban rail transit projects because of its high efficiency,safety and small construction impact. However,there is no rectangular jacking method in Guangdong rail transit project. Taking the rectangular pipe jacking construction of Guangzhou Metro No.11 as an example,the construction data of pipe jacking site were collected by realistic recording method,the consumption data of fixed personnel machine for pipe jacking project was summarized and analyzed,and the supplementary quota of pipe jacking was compiled. The supplementary quota can provide reference for Guangdong urban rail transit project budget preparation,bidding preparation and other pricing projects.
Keywords:Guangdong Province;urban rail transit;pipe jacking engineering;project cost;supplementary quota
参考文献
[1] 叶忠帅.并行矩形顶管施工对地层变形影响及控制研究[D].广州:暨南大学,2022.
[2] 杨凯.施工企业定额建设中存在的问题及对策[J].建筑经济,2024(2).
[3] 华攸和.反井钻机开挖导井(3.5m)补充定额编制研究[J].建筑经济,2021(7).
[4] 张星海,刘子长,姜美利,等.全流程自动计价方法在城市轨道交通动力照明系统中应用[J].建筑经济,2024(9).
[5] 史立梅.管幕冻结工法补充定额测定与应用[J].公路,2021(12).
建筑经济,2025(6):75-81
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!