基于风险分析的高速公路项目融资方案比选研究
夏立明 孟丽 赵春雪
(天津理工大学管理学院, 天津 300384)
文献要素
[摘 要] 鉴于高速公路项目融资的特点,风险的合理分担和控制方式是影响其融资成败的关键因素之一。如何在高速公路项目融资方案选择时有效防控融资风险,成为业内专家学者和实际管理人员面临的重大难题。文章采用霍尔理论建立高速公路项目融资风险的三维结构模型,依据SMART原则建立其风险评价指标体系,在此基础上运用模糊层析分析法从风险分析的角度建立高速公路项目融资方案比选模型,并给出了具体的比选过程和步骤。
[关键词] 高速公路项目,融资,风险分析,模糊层析分析法
Abstract: In view of the characteristics of highway project financing, risk sharing and control is one of the key factors for its success. How to prevent and control financing risk in the selection of the highway project financing scheme is a major challenge for the industry's experts and the actual management. This paper establishes a three-dimensional structure model of highway project financing risk with Hall Theory, builds a risk assessment indicator system based on SMART principles, using the fuzzy chromatography analysis, establishes a highway project financing scheme comparison model in the perspective of risk analysis, and gives a specific ratio of the comparison process and steps.
Key words: highway project, financing, risk analysis, fuzzy chromatography analysis
[参考文献]
[1]李用鹏,杨和平.广西区BOT投融资模式修建高速公路的现状及思考[J].中外公路,2009(4).
[2]M.Dailami,I.Lipkovich.INFRI-SK:A computer simulation approach to risk management in intrastructure project finance transactions[R].World Bank Group,2001.
[3]Mansoor Dailami, Danny Lei-pziger. Infrastructure project finance and capital flows: a new perspective[J].World Development,1998(7).
[4]王艳伟,王松,潘发余.BOT-TOT-PPP项目综合集成融资模式研究[J].科技与管理,2009(1).
[5]姚敏,秦旋.我国公共工程项目建设与项目融资模式[J].基建优化,2004(2):12-14.
[6]公平.投资多元化公路公共风险分析与防范研究[D].西安:长安大学,2009.
[7]Yeo,K.T., Tiong,R.L.K.Positive management of differences for risk reduction in BOT project[J].International Journal of Project Management,2000,18(4):257-265.
[8]Nisangul Ceran. Private participation in infrastructure:A risk analysis of long-term contracts in power sector[D].Ph.D.Thesis,George Mason University,2002.
[9]Dikmen,I.,Birgonul,M.T.,Han,S.Using fuzzy risk assessment to rate cost overrun risk in international construction projects[J]. International Journal of Project Management, 2007,25(5):494-505.
[10]周璇,林桦.模糊层次分析法(FAHP)对港址选择的评价[J].中国水运,2008(12).
[11]桂黄宝,赵付民.基于模糊层次分析法(FAHP)的合作技术创新伙伴选择研究[J].科学学与科学技术管理,2007(9).
[12]姜艳萍,樊治平.三角模糊数互补判断矩阵排序的一种实用方法[J].系统工程,2002(3).
建筑经济,2010(5):23-26
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!