基于2008清单计价规范的施工合同价款调整实践研究
王朝霞
(山西建筑职业技术学院, 山西 太原 030006)
文献要素
[摘 要] 从具体工程案例中施工合同价格调整条款存在缺陷出发,根据“08清单计价规范”有关规定,提出了工程实践中合同价款的调整方法及价款调整约定需明确的事项,以期达到为发、承包双方签订既符合双方合法权益又对工程造价能进行良好控制的施工合同提供参考。
[关键词] 综合单价,合同价款,价款调整
Abstract: Based on Code of Valuation with Bill Quantity of Construction Works in 2008, the paper discusses the flaws existed in the adjustment of construction contract price in specific cases. In terms of some stipulations of adjustment of construction contract pricing, it proposes the way to adjust contract price in engineering practice and some items to determine about price adjustment. It hopes to provide references to both sides in accordance with not only their legal rights but also a well-controlled engineering prices.
Key words: comprehensive unit price; contract price; price adjustment
[参考文献]
[1]《建设工程工程量清单计价规范》编制组.《建设工程工程量清单计价规范》宣贯辅导教材[M].GB50500-2008.北京:中国计划出版社,2008.
[2]中国建设工程造价管理协会.建设工程造价管理理论与实务[M].北京:中国计划出版社,2008.
[3]福建省房屋建筑和市政基础设施工程价款结算暂行办法[Z].闽财建〔2007〕157号文.
[4]北京市关于执行《建设工程工程量清单计价规范》(GB50500-2008)若干意见的通知[Z].
[5]叶进.08清单在竣工结算中的应用[EB/OL].http://www.glodon.com/zyqk/dianziban/09%E7%AC%AC%E4%B8%89%E6%9C%9F/online.htm广联达服务新干线.2009.6/2009.9.
建筑经济,2010(4):116-118