建设工程竣工结算时效性影响因素及提升建议
(中央军委后勤保障部某部,北京 100071)
- 文献要素
-
摘要:竣工结算是建设工程投资控制的重要环节,是发包人与承包人对工程款项最终的清理结算。本文在研究承发包双方在建设工程竣工结算过程中的工作内容、时间要求的基础上,分析承包人编制提交竣工结算文件时效性和发包人审查竣工结算文件时效性的影响因素,并提出提升建设工程竣工结算时效性的建议,希望为竣工结算工作顺利开展提供参考。关键词:建设工程;竣工结算;时效性Abstract:Completion settlement is a crucial part of investment control in construction projects,representing the final financial settlement between contractors and employers regarding project payments. Based on the study of the work and time requirements for both contractors and employers during the completion settlement process of construction projects,this paper analyzes the influencing factors of the timeliness of the completion settlement documents prepared and submitted by the contractor,as well as the timeliness of the review of these documents by the employer. Furthermore,the suggestions are proposed to enhance the timeliness of construction project completion settlement,aiming to provide references for the smooth conduct of completion settlement work.Keywords:construction project;completion settlement;timeliness参考文献[1] 住房和城乡建设部.建设工程工程量清单计价规范GB50500-2013[S].北京:中国计划出版社,2013.[2] 中国建设工程造价管理协会.建设项目工程结算编审规程CECA/GC 3-2010[S].北京:中国计划出版社,2010.[3] 中国建设工程造价管理协会.建设工程造价咨询成果文件质量标准CECA/GC 7-2012[S].北京:中国计划出版社,2012.[4] 邹鑫,陈丹昊,张立辉.考虑模糊工序工期的重复性项目时间费用权衡优化[J].工业工程,2024(4):150-160+170.[5] 王华平.工程竣工结算审核的常见问题及要领[J].工程经济,2019(1):5-7.[6] 杨小莉.建设工程结算审核的思考[J].建筑与预算,2021(11):29-31.[7] 秦丽娟,陶卫君.基于竣工决算审计视角的建设项目投资管控策略[J].建筑经济,2022(7):78-84.[8] 吴霄,汤孟刚.建筑材料价差调整办法的实际应用——以某水利项目为例[J].建筑经济,2022(12):69-76.[9] 雷智豪.政府投资项目竣工结算争议诱发因素研究[J].建筑经济,2024(5):100-104.建筑经济,2024(11):14-19