基于业主视角的工期延误索赔管理研究——以F水电站工程项目为例
罗颖芳 邹景谋 付玉凤 卜炜玮
(1.云南省天然气有限公司,云南 昆明 650200;2.云南大学,云南 昆明 650500)
文献要素
摘要:从业主视角出发,以F水电站工程项目索赔管理为研究对象,对该项目实施进程中两个工期延误索赔案例的处理过程和结果进行介绍,结合现有研究对比分析F水电站业主面对两索赔事件时实施索赔管理的思路与模式,总结工程项目在索赔应对过程中应遵循的管理原则,并提出工期延误索赔管理的启示,以期为业主方工期延误索赔管理提供参考。
关键词:工期延误索赔;业主方;水电站工程项目;案例研究
Abstract:Starting from the owner's point of view,taking the claim management of the F hydropower plant project as the research object,introducing the handling process and results of the two construction delay claim cases in the project implementation process,combining with the existing research to comparatively analyse the ideas and modes of claim management implemented by the owner of the F hydropower plant in the face of the two claim events,to summarise the management principles that should be followed by the engineering project in the process of responding to the claims,and to put forward the revelation of the construction delay claim management in order to provide the reference for the owner's side of the construction delay claim management.
Keywords:claims for delay in construction;owners;hydroelectric power plant projects;case study
参考文献
[1] 廖建勋.建设工程项目承包商的合同索赔管理研究[D].大连:大连理工大学,2013.
[2] 姚雪莲.基于承包人视角的工程索赔管理研究[J]. 建筑经济,2023(7):53-59.
[3] 朱萌萌.工程总承包模式下城市更新项目工期索赔管理[D].青岛:山东科技大学,2021.
[4] 杨德钦.多事件干扰下工期延误索赔原则研究[J]. 土木工程学报,2003(3):37-40,45.
[5] 吴经纬.施工方视角下的工期延误索赔计算综述及启示[J].工程建设,2021(10):73-78.
[6] 李振忠.多事件交叉干扰下工期延误索赔处理思路探讨[J].宁夏大学学报(人文社会科学版),2011(6):74-78.
建筑经济,2024(6):67-72
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!