工程造价改革背景下财政投资项目组价对策探讨
(广州开发区财政投资建设项目管理中心,广东 广州 510663)
- 文献要素
-
摘要:在分析工程造价改革对财政投资项目组价实质影响的基础上,提出通过收集内外部数据、采用BIM技术等建立工程造价数据库,规范最高投标限价的编制、合理确定变更新增综合单价等对策建议供同行参考借鉴,希望破解工程造价改革背景下逐步取消定额后组价无权威性的、政府主导的标准可套用的难题。关键词:工程造价改革;财政投资项目;组价对策;造价数据库Abstract:Based on the analysis of substantive impact of engineering cost reform on financial investment projects,the paper proposes pricing strategies from the following aspects:establishing cost database by collecting internal and external data and adopting BIM technology .etc,standardizing the preparation of the maximum bidding price limit,reasonably determining the newly added comprehensive unit price of changes,hopes to solve the problem of the lack of authoritative and government led standards that can be directly applied after gradually canceling quotas in the context of engineering cost reform.Keywords:engineering cost reform;financial investment projects;pricing strategies;cost database参考文献[1] 刘淼.工程造价改革下建设单位投资管控机制研究[J].房地产世界,2021(16):51-55.[2] 龚保儿.聚焦工程造价改革国家取消预算定额的必要性与行业影响[J].建筑,2020(20):16-19.[3] 施巍.建筑工程造价的司法鉴定过程中遇到的法律问题[J].法制博览,2023(4):105-107.[4] 汤林梅.浅谈新形势下工程造价改革之路[J].四川建筑,2022(1):219-222.[5] 李瑜.装配式建筑设计阶段的造价控制难点与实施路径[J].建筑设计,2022(11):31-33.[6] 徐恩利,汤佩豫,方欣,等.数字化转型背景下工程造价信息数据库的构建研究[J].建设监理,2023(7):46-77.[7] 阎卫东,周杰.政府投资项目全过程造价动态化管控体系研究[J].沈阳建筑大学学报(社会科学版),2022(6):571-577.建筑经济,2024(1):61-67