政府投资项目EPC模式发包时点选择研究
(1.电子科技大学(深圳)高等研究院,广东 深圳 518110;2.北京建筑大学,北京 102616)
- 文献要素
-
摘要:以EPC模式来实施政府投资项目时,发包时点的选择对于业主与承包商之间的合理风险分担以及项目管理工作的开展具有重要影响。本文首先梳理我国当前法律法规中关于政府投资项目选择EPC模式时对发包时点的三种不同规定;其次,分析影响发包时点选择的关键因素;最后,对不同发包时点下的计价模式、招标方式及限额设计措施等业主关键管控要点进行分析,以期为政府投资项目EPC模式的提质增效提供参考。关键词:EPC模式;发包时点;影响因素;风险应对Abstract:The selection of the contracting time point of the EPC mode of government investment projects has an important impact on the reasonable risk sharing between the contracting party and the contractor and the targeted development of project management. This paper first sorts out the three different time points of the EPC mode contracting of government investment projects in my country’s current laws and regulations;secondly,distinguishes the factors that affect the selection of contracting time points;finally,analyzes the relative risk control measures such as contract valuation,bidding and limit design of EPC projects,so as to realize the quality and efficiency of the EPC model.Keywords:EPC mode;time point of contract issuance;influencing factors;risk response参考文献[1] 王伍仁.EPC工程总承包管理模式探索及展望[J].中国勘察设计,2020(10):40-49.[2] 李华威,金威,俞建强,等.设计牵头的PPP+EPC项目管理研究——以义乌商城大道隧道工程项目为例[J].建筑经济,2023(5):30-38.[3] 龙亮,李芬,尹贻林,等.基于价值共创的EPC项目设计管理研究[J].建筑经济,2021(7):40-44.[4] 尹贻林,蔡俊峰,于翔鹏,等.中国情境下EPC项目的计价模式控制研究——基于模拟工程量清单招标[J].项目管理技术,2017(12):32-36.[5] 韦可.不同介入时点的EPC模式下风险分担机制的设计研究[D].天津:天津理工大学,2020.[6] 王勇军.限额设计在EPC项目中的应用研究[J].建筑经济,2022(11):67-72.建筑经济,2023(11):49-52