- 文献要素
-
摘要:工程索赔是建筑市场中的常见现象。基于承包人视角,就工程索赔的基本情形以及形成原因进行分析;对照建设工程施工合同示范文本,就合同条款与名称中常见的容易引发工程索赔的干扰事件进行对应梳理,归纳检索出工程承包人工程索赔的相关机会与节点,同时就工程索赔成立的基本条件,基于承包人视角的工程索赔管理要点,包括索赔原则与方法,索赔处理程序,工程索赔内容与索赔计算等进行阐释,以期为相关同业开展工程索赔提供
参考。
关键词:企业经营管理;承包人;索赔管理;工程索赔
Abstract:Engineering claims are a common phenomenon in the construction market. This article analyzes the basic situation and causes of engineering claims from the perspective of contractors;Based on the demonstration text of the construction contract for construction projects,the common interference events that can easily trigger engineering claims in the contract terms and names were correspondingly sorted out,and the relevant opportunities and nodes of engineering contractor engineering claims were summarized and retrieved. At the same time,the basic conditions for establishing engineering claims were discussed,and the key points of engineering claim management from the contractor’s perspective were discussed,including principles and methods of claims,and claim processing procedures,The content and calculation of engineering claims were explained,in order to provide reference for relevant industries to carry out engineering claims.
Keywords:enterprise operation and management;the contractor;claim management;engineering claim
参考文献
[1] 中华人民共和国住房和城乡建设部,中华人民共和国国家工商行政管理总局.关于印发工程造价改革工作方案的通知[EB/OL].https://www.mohurd.gov.cn/gongkai/fdzdgknr/tzgg/201710/20171030_233757.html,2017-09-22/2022-11-25.
[2] 魏保平.FIDIC银皮书与我国新版工程总承包合同示范文本的索赔管理比较研究[J].建筑经济,2022(S1):674-678.
[3] 王璐.建筑工程合同管理与风险防范控制研究[J].商讯,2022(21):145-148.
[4] 朱文新.工程建设阶段的合同管理与费用控制措施[J].四川建材,2022(9):209-210.
[5] 袁波,张德刚.建筑工程中的工程索赔技巧[J].江苏建材,2022(2):116-117.
[6] 李东旗.EPC工程全周期总承包商索赔管理研究[D].济南:山东大学,2021.
[7] 赵静源,张慧洁.工程量清单计价模式下的工程索赔管理相关问题探究[J].建筑与预算,2021(9):53-55.
[8] 尹宇杰.工程索赔审查判断的计算模型探究[J].山西建筑,2021(14):162-165.
[9] 耿静雅.建设工程施工合同利润索赔的障碍因素及改进研究[D].重庆:重庆大学,2021.
[10] 刘宁,黄山.工程索赔时效性逾期索赔问题——基于承包商视角的分析[J].知与行,2020(3):26-31.
建筑经济,2023(7):53-59