城市轨道交通工程设计概算风险控制研究
余轲
(中铁第四勘察设计院集团有限公司,湖北 武汉 430063)
文献要素

摘要:城市轨道交通工程技术复杂,投资巨大,合理确定其工程造价成为参建各方关注的焦点。本研究以现有城市轨道交通工程造价管理规定为基础,结合实际项目设计概算编制经验,从合规性、合理性和完整性等方面论述了总概算的风险点及控制对策,从特殊工法计价、工程数量计算、定额套用等方面论述了分册概算的风险点及控制对策。
关键词:城市轨道交通;设计概算;风险点;控制对策
Abstract:Urban rail transit engineering technology is complex and the investment is huge. Reasonable determination of the project cost has become the focus of all parties involved in the construction. Based on the existing urban rail transit project cost management regulations,combined with the actual project design budget preparation experience,this study discusses the risk points and countermeasures of the total budget from three aspects:compliance,rationality and integrity. Discusses the risk points and countermeasures of the sub-volume budget in three aspects of special construction valuation,engineering quantity calculation,and quota application.
Keywords:urban rail transit;design budget;risk point;control strategy
参考文献
[1] 周晓勤.中国城市轨道交通发展战略与“十四五”发展思路[J].城市轨道交通,2020(11):16-21.
[2] 住房和城乡建设部.城市轨道交通工程设计概算编制办法:建标〔2017〕89号[S].北京:中国计划出版社,2017.
[3] 住房和城乡建设部.城市轨道交通工程建设标准:建标104-2008[S].北京:中国计划出版社,2008.
[4] 赵峰.我国城市轨道交通工程造价指标变化趋势分析[J].城市轨道交通研究,2021(10):82-85.
[5] 王立勇.城市轨道交通工程技术经济指标[M].北京:中国建筑工业出版社,2016.
[6] 徐纳.城市轨道交通项目工程造价说明书标准化研究[J].建筑经济,2020(10):61-63.
[7] 许尔淑,钟文龙,张红标.城市轨道交通工程定额编制研究[J].建筑经济,2022(6):65-69.
[8] 李鹏.城市轨道交通工程造价控制措施探讨[J].铁道工程学报,2017(8):89-92.
[9] 周玲芳.城市轨道交通工程造价的全过程控制[J].市政技术,2016(2):197-199.
建筑经济,2022(12):56-62

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!