设计施工总承包模式下设计审批争议的成因及其应对策略
严玲 刘瑞
(天津理工大学管理学院,天津 300384)
文献要素

摘要:与传统发包模式不同,设计施工总承包项目实践中的部分设计由承包商完成,在设计审批阶段双方对于承包商的设计成果是否满足合同要求有着不同的判定标准,因此容易产生争议,而争议能否及时解决则影响着整个项目目标的实现。本文通过分析设计施工总承包模式下两阶段设计控制权的配置问题引出业主与承包商之间的设计审批争议,接着探究设计审批争议的成因并对三种不同类型事件驱动下的设计审批争议案例进行分析,最后针对这三种成因提出应对策略以供实践参考。
关键词:设计施工总承包;设计管理;设计审批;争议成因
Abstract:Different from the general contracting mode,parts of the design in the practice of the design and construction general contracting project is completed by the contractor,and in the design approval stage,the two parties have different criteria for judging whether the contractor’s design results meet the requirements of the contract,so it is easy to have disputes,and whether the disputes can be resolved in time affects the realization of the entire project objective. This paper analyzes the control configuration problems of two-stage design under the design-build mode to lead to the design approval disputes between the owner and the contractor,then explores the causes of the design approval disputes and analyzes the cases of design approval disputes driven by three different types of events,and finally proposes the response strategies for these three causes for practical reference.
Keywords:design-build mode;design management;design approval;the causes of the dispute
参考文献
[1] 张水波,杨秋波.国际EPC交钥匙合同业主方的设计管理[J].中国港湾建设,2008(5):63-66.
[2] 楼海军.国际水泥工程EPC总承包的设计风险及应对措施[J].水泥,2010(3):24-27.
[3] 张启斌,王赫.国际EPC水泥工程总承包项目设计审批影响因素分析[J].水泥工程,2017(1):74-79.
[4] 王赫,张卫东.国际EPC项目设计审批的问题与对策[J].国际经济合作,2015(9):73-77.
[5] 张浩.国际EPC合同“设计标准版次适用”引起的争议[J].国际经济合作,2014(8):65-68.
[6] 龙亮,李芬,尹贻林,等.基于价值共创的EPC项目设计管理研究[J].建筑经济,2021(7):40-44.
[7] 严玲,李卓阳.工程总承包合同条件下业主方发起变更的风险责任认定研究[J].建筑经济,2020(3):11-15.
建筑经济,2022(10):49-57

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!