基于进度风险管理的房地产项目开发预控内容及应对分析
马腾
(中铁建设集团置业有限公司,北京 100000)
文献要素
摘要:针对房地产项目在开发过程中经常出现进度滞后的问题,从工程业务部门角度出发,梳理了建设单位在项目开发决策阶段、设计阶段、总包招标阶段、施工阶段的预控内容,期望通过对这些事项的提前谋划和决策,实现房地产项目开发进度风险的预防控制。
关键词:房地产;项目管理;进度控制;风险防控
Abstract:In view of the problem that the progress of real estate projects often lags behind in the development process,this paper combs the pre control contents of the construction unit in the project development decision-making stage,design stage,general contractor bidding stage and construction stage from the perspective of the engineering business department,and expects to achieve the prevention and control of the progress risk of real estate project development through the advance planning and decision-making of these matters.
Keywords:real estate;project management;progress control;risk prevention and control
参考文献
[1] 董士波.全生命周期造价管理研究[D].哈尔滨:哈尔滨工程大学,2003.
[2] 陈泉.商住型房地产开发项目决策阶段的风险管理研究[D].赣州:江西理工大学,2015.
[3] 李鑫.房地产开发项目设计阶段成本管理研究[D].开封:河南大学,2019.
[4] 张红玉.房地产开发项目交付风险管理研究[D].贵州:贵州大学,2021.
[5] 王成汉.辽阳TH房地产开发项目风险管理案例研究[D].大连:大连理工大学,2018.
建筑经济,2022(09):49-53
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!