基于政府出资人视角的PPP项目合同审议要点研究
凌学东
(北京市住房和城乡建设委员会,北京 101160)
文献要素
摘要:PPP项目合同是项目全生命周期实施的基本遵循与保障。政府出资人宜本着实事求是、合作共赢的原则,重点审议合同中社会投资方主导项目实施的条款、主管部门对划拨用地开展商业经营的意见、社会投资方出资来源及对项目承担连带责任的可行性、施工图超越招标图的投资承担及股比调整、暂列金的使用范围及条件、合同再谈判起始期与触发条件、超额收益分成的累进比率、运营期间公共需求保障、运营期满的残值处置和移交涉税等,以构建PPP项目利益共享与风险分担机制,稳定合同预期,减少履行争议。
关键词:PPP项目;政府出资人;合同审议;要点
Abstract:PPP project contract is the basic compliance and guarantee during the whole life of the contract implementation. Based on the general principle of seeking truth from facts and win-win cooperation,government investors should especially review the contract terms of project implementation led by social investors,the opinion of competent department on the commercial operation on allocated land,the social capital resources,the feasibility of social investors' joint liability for PPP project,the investment commitment and adjustment of share ratio caused by the construction drawing’s exceeding to bidding drawing,the scope and conditions for use of provisional sum,the starting period and trigger conditions of contract renegotiation,the progressive ratio of excess income sharing,the public demand guarantee during operation,the disposal of residual value at the end of operation and the transfer taxes,in order to build benefit and risk sharing mechanism of PPP project,stabilize contract expectation,and reduce performance disputes.
Keywords:PPP project;government investor;contract review;key points
参考文献
[1] 李成祥,李庆瑞.PPP融资模式下的问题及对策研究[J].经济研究导刊,2019(1).
[2] 木江涛,王宏伟.产业园区基础及公共设施建设PPP项目合同要点及对策[J].建筑经济,2020(9).
[3] 北京市住房和城乡建设委员会.关于进一步规范北京市房屋建筑和市政基础设施工程施工发包承包活动的通知[Z].北京,2011-03-31.
[4] 杨学平,姜吾辉.PPP项目合同主要条款谈款实务[J].中国集体经济,2020(11).
[5] 卜炜玮,周振,林雪.城市基础设施PPP项目合同治理中的风险分担研究[J].建筑经济,2020(7).
建筑经济,2022(08):89-93
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!