勘察设计成果质量保障机制研究——施工图审查制度取消后的思考与建议
(浙江江南工程管理股份有限公司,浙江 杭州 310007)
- 文献要素
-
摘要:回顾施工图审查制度发展的历程,结合研究团队参与实施的不同地区、不同建设组织模式和不同使用功能的工程建设项目的设计管理实践,对施工图审查制度发挥的作用与局限性进行分析研究,梳理当前建筑市场对取消施工图审查制度的应对措施及市场影响。在此基础上,提出施工图审查制度取消后勘察设计成果质量保障机制方面的建议。关键词:勘察设计成果;施工图审查;质量保障机制Abstract:This paper reviews the history of the development of the construction drawing review system. In addition,by investigating the research team’s design management practices of engineering construction projects in different regions,construction organization modes,and use functions,highlights the construction drawing review system’s roles and limitations,sorts out the approaches and impacts of the current construction market regarding the abolition of the construction drawing review system.On this basis,proposes solutions to the quality assurance mechanism of survey and design results after the abolition of the construction drawing review system.Keywords:survey and design results;review of construction drawings;quality assurance mechanism参考文献[1] 何立山,姜兴周,唐礼民,等.施工图审查权应回归设计单位[J].建筑设计管理,2018(3):10-12.[2] 关于全面开展工程建设项目审批制度改革的实施意见[Z].国办发〔2019〕11号.[3] 余宏亮.国内外建设工程施工图审查制度比较研究[J].建筑经济,2011(9):9-11.[4] 徐洪,徐梓力.浅谈施工图审查未来的走向[J].中华建设,2021(3):40-41.[5] 住建部.房屋建筑和市政基础设施工程施工图设计文件审查管理办法[Z].[6] 孙少华.取消施工图审查制度对设计单位的影响[J].城市道桥与防洪,2019(7):247-249+29.[7] 张军.对施工图审查工作的思考和建议[J].中国勘察设计,2020(11):64-67.建筑经济,2022(07):5-10