- 文献要素
-
摘要:基于湛江市“十三五”期间已建或在建的代建制建筑工程建设项目数据资料,从主体冲突发生的矛盾根源和冲突属性两个维度,深入分析主体矛盾冲突作用机理和运动规律,提出应用矛盾论基本观点构建政府投资项目主体冲突协调机制的思路方法。
关键词:政府投资;代建项目;冲突机制;协调干预;矛盾论
Abstract:Based on the data of agent construction projects built or under construction during the 13th Five Year Plan period in Zhanjiang,this paper analyzes the mechanism and movement rule of subject conflict from the two dimensions of conflict origin and conflict attribute,and puts forward a method to construct the coordination mechanism of government investment project subject conflict with the basic viewpoint of contradiction theory.
Keywords:government investment;generation project;conflict mechanisms;coordinating interventions;contradiction theory
参考文献
[1] 雷丽彩,周晶,许继文.考虑决策者态度的大型工程利益相关者的冲突协调方法研究[J].管理现代化,2017(1):46-48.
[2] 吴家宝.公立医院政府投资项目代建制研究[D].南京:南京大学,2019.
[3] Tomás C. Prieto-Remón,Jose Ramón Cobo-Benita,Isabel Ortiz-Marcos,Angel Uruburu. Conflict Resolution to Project Performance[J]. Procedia-Social and Behavioral Sciences,2015,194.
[4] 吴梦强.政府投资代建项目建设主体冲突管理研究——以湛江中心人民医院迁建项目为例[J].建筑经济,2020(12):41-45.
[5] 任远.代建方的工程项目冲突与沟通管理[J].中国工程咨询,2010(4):51-53.
[6] 孟桂芹.代建制下项目利益相关方协调管理研究[D].北京:北京建筑大学,2017.
建筑经济,2021(09):83-87