建设单位工程造价全过程管控要点分析
韩会宾
(辽宁工业大学经济管理学院,辽宁 锦州 121001)
文献要素

摘要:建筑工程造价管控贯穿于项目建设的全过程,若想实现对建筑工程造价的全面有效管控,需要掌握建筑工程项目各个阶段的造价管控要点。分析建筑工程项目决策、设计、招投标、施工、竣工验收五个阶段造价管控要点。以某项目为例,介绍建设单位在各阶段所采用的具体造价管控措施,希望能够对其他同类建筑工程项目全过程造价管控有所帮助。
关键词:建筑工程;全过程造价;管控要点;建设单位
Abstract:The cost control of building engineering plays a role on the whole process of construction,there fore it’s necessary to master the key points of cost control at each stage of construction for making the building engineering cost be controlled comprehensively and effectively. This paper analyzes the key points of cost control in five stages of construction project decision-making,design,bidding,construction,completion and acceptance. Taking a project as an example,this paper introduces the concrete cost control measures adopted by the construction unit in each stage,hoping to be helpful to the whole process cost control of other similar construction projects.
Keywords:building engineering;whole process cost;control key points;construction unit
参考文献
[1] 宋丽霞,伍晓华,柳金英,等.基于全过程造价管理下的施工阶段工程造价动态控制[J].施工技术,2016(S1):818-820.
[2] 宋靖华,朱羽翼,游绍勇.基于BIM技术的工程项目全过程造价控制研究[J].建筑经济,2020(5):88-91.
[3] 尹顺达,赵满路,张华.高校基建项目造价全过程协同管理机制构建[J].会计之友,2018(17):108-110.
[4] 王维敏.高速公路大修改造工程的全过程造价控制研究[J].公路工程,2018(1):202-205.
[5] 戚小燕.浅谈建设工程全过程工程造价控制管理[J].现代城市研究,2015(1):66-68.
建筑经济,2021(08):52-56

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!