- 文献要素
-
摘要:从分析地下洞挖工程超挖超填原因入手,剖析超挖超填计量常见争议,分别从实施阶段责任认定和招投标阶段合同条款约定两个方面提出超挖超填问题的处理和预防措施。最后,提出超挖和超填工程量和单价的确定方法,旨在为其他类似项目避免或解决超挖超填结算问题提供参考借鉴。
关键词:地下洞挖;超挖超填;计量与计价;结算争议
Abstract:This paper analyzes the causes of over-excavation and over-filling in underground tunnel excavation engineering,and the common disputes in the measurement of over excavation and over filling,and puts forward the treatment and prevention measures of over excavation and over filling from two aspects of both responsibility identification in implementation stage and contract provisions in bidding stage. Finally,puts forward the method to determine the quantity and unit price of over excavation and over filling,providing reference for other similar projects to avoid or solve the settlement problems of over excavation and over filling.
Keywords:underground tunnel excavation;over-excavation and over-filling;measurement and valuation;settlement dispute
参考文献
[1] 水电水利规划设计总院可再生能源定额站.水电工程造价指南[M].第3版.北京:中国水利水电出版社,2013.
[2] 胡诚,张建龙.水电工程地下洞室石方超挖计量计价的处理方法[J].水电与抽水蓄能,2017(2):146-148+145.
[3] 简崇林,付继林,唐道初.浅议地下洞室地质缺陷超挖的管理及认定——以乌东德地下电站为例[J].水电与新能源,2015(8):44-47.
建筑经济,2021(04):70-73