您现在的位置:建筑经济>>往期回顾>2021年>第3期>>文献要素
基于JIT理论的PC构件生产调度模型研究
王淑嫱 彭赛青 梁正伟 卢仲兴
(1.湖北工业大学 土木建筑与环境学院,湖北 武汉 430068;2.中建三局绿色产业投资有限公司,湖北 武汉 430056)
文献要素

摘要:通过分析PC构件生产调度特点与问题,提出以PC构件生产方为研究视角,以JIT准时生产方式为指导,以BIM技术应用为支撑,建立订单组合模型和生产线排产模型。以武汉市某装配式项目PC构件生产为例,验证算法的科学性和适用性,期望为PC构件生产与施工的连续与均衡、提高生产线利用率提供参考。
关键词:装配式建筑;PC构件;生产调度;BIM;JIT
Abstract:This paper establishes an order combination model and a production line scheduling model from the perspective of the PC component manufacturer on the basis of analyzing the characteristics and problems of PC component production scheduling,which was guided by the JIT just-in-time production method,and supported by the application of BIM technology. Takes the PC component production of a prefabricated project in Wuhan as an example and verifies the scientificity and applicability of the algorithm,hopes to provide reference for the continuous and balanced PC component production and construction,and improving the utilization of the production line.
Keywords:prefabricated building;PC component;production scheduling;BIM;JIT
参考文献
[1] 周遵红.装配式住宅预制构件生产优化方法研究[D].重庆:重庆交通大学,2018.
[2] 陈浩.基于多方案比选的PC构件生产流程优化与仿真研究[D].武汉:湖北工业大学,2019.
[3] Wang Z,Hu H.Improved Precast Production–Scheduling Model Considering the Whole Supply Chain[J]. Journal of Computing in Civil Engineering,2017(4):04017013.
[4] ANGELOUDIS P,ANVARI B,OCHIENG W Y. A multi-objective GA-based optimisation for holistic Manufacturing,transportation and Assembly of precast construction[J]. Automation in construction. 2016(2):226-241.
[5] 马士华,王青青.同步物流系统下准时化生产与配送调度问题研究[J].中国管理科学,2012(6):125-132.
[6] 郝丽,胡大伟,李晨.T-JIT环境下企业供应链中采购管理供应商选择和订单分配[J].公路交通科技,2018(1):149-158.
[7] 马钰戈,刘永,郝娟,等.JIT供应链物料采购协同优化及其粒子群算法[J].计算机工程与应用,2018(2):259-265.
[8] 王淑嫱,彭赛青,卢仲兴.基于BIM的PC构件设计与生产信息集成及应用研究[J].建筑经济,2020(5):109-114.
建筑经济,2021(03):101-105

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!