海外工程变更优化与索赔调价实践分析——以非洲某行政楼项目为例
张建业
(中国土木工程集团有限公司,北京 100038)
文献要素

摘要:国际工程项目在实施过程中受相关因素影响往往会在施工环节出现诸多问题,因而需要进行适当的变更优化和索赔调价。结合非洲某行政楼项目的工作实践,总结国际工程项目施工过程中进行变更优化、索赔调价的相关经验,基于实践经验与感悟,提出相关建议,以期为类似工程的项目管理提供一些参考。
关键词:项目管理;变更优化;索赔调价;实践分析
Abstract:There are some problems often occur in the construction process during the implementation of international engineering projects affected by relevant factors,thus it needs appropriate changes or optimization and claims for compensation or price adjustment. Based on the practical work of an Africa administrative building project,this paper summarizes the relevant experience of changes,optimization,claims and price adjustment during the process of international engineering project construction,and based on practical experience and insights,proposes some suggestions,so as to provide some references for project management of similar projects.
Keywords:project management;changes and optimization;claim and price adjustment;practice and analysis
参考文献
[1] 王绍锋,王贤光.处理好与监理工程师关系的重要性及其案例[J].国际经济合作,2004(1).
[2] 张力.建设工程变更索赔实施策略[J].建筑技术,2012(10).
[3] 吴筱文,高金光,肖荣,等.海外道路工程项目索赔实例分析[J].建筑经济,2018(10).
[4] 田威.FIDIC合同中的价格调整和调价公式[J].国际经济合作,1995(2).
[5] 成虎,吴九明.工程总承包项目的运作过程和合同分析[J].施工技术,2004(12).
[6] 张水波,何伯森.FIDIC新版合同条件导读与解析[M].北京:中国建筑工业出版社,2003.
建筑经济,2021(02):56-59

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!