工期延长导致的施工方资金利息损失的索赔计算方案研究
吴经纬
(山河建设集团有限公司,湖北 武汉 430063)
文献要素

摘要:针对工期延长导致的施工方资金利息损失的索赔计算中的难点进行研究,并提出合理的解决方案。施工方确定各项计算参数,确定工期延长时间并区分对应的责任人,选择合适的利息分摊计算模型进行计算,可以较为精确地计算出相关的资金利息。最后,通过两个案例来说明工期延长导致施工方资金利息损失索赔计算方案的应用。
关键词:工期延长,施工方,资金利息,索赔,计算
Abstract:This paper studies the difficulties in the calculation of the construction party’s capital interest loss caused by the extension of the construction period,and puts forward reasonable solutions. The construction side determines the calculation parameters,determines the extension of the construction period,distinguishes the corresponding responsible person,selects the appropriate interest allocation calculation model and carries out the calculation,and can calculate the relevant capital interest more accurately. Finally,two examples are given to illustrate the application of the calculation scheme of interest loss of construction company’s capital caused by the prolonged construction period.
Keywords:time limit extension;construction side;interest on funds;claims;calculation
参考文献
[1]宋阳.论交易习惯的司法适用及其限制[J].比较法研究,2017(6):178-190.
[2]最高人民法院.关于逾期付款违约金应当按照何种标准计算问题的批复[Z].1999.
[3]王仁超,褚春超,欧阳斌.工程延误责任研究[J].水力发电学报,2004(2):6-11.
[4]朱建国,徐伟,沈杰,等.多事件干扰下工期拖延责任分摊计算[J].东南大学学报(自然科学版),2012(1):192-197.
[5]葛启仁.建设工程流动资金利息的计算方法探讨[J].西部探矿工程,2006:576-578.
[6]王凯,郭彬,闫金兵.FIDIC合同条件下由工程款延期支付引起的工期索赔计算[J].中国港湾建设,2011(2):74-77.
建筑经济,2021(01):77-82

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!