您现在的位置:建筑经济>>往期回顾>2020年>第10期>>文献要素
我国建筑业推行EPC模式制约因素分析
李辉山 雒倩倩
(兰州理工大学土木工程学院,甘肃 兰州 730050)
文献要素

摘要:通过文献研究、专家访谈和问卷调查法归纳识别出我国建筑业推行EPC模式的13个主要制约因素,采用Grey-DEMATEL法分析各制约因素间的因果关系及重要性,并在此基础上分析各因素的敏感性。结果表明:EPC相关法律法规不完善、工程咨询监理与EPC总承包的要求不匹配是原因因素,业主的意愿是结果因素,缺乏EPC模式下的复合型人才和管理团队是关键的制约因素,并据此提出相关措施建议以促进
其推行。
关键词:EPC模式;建筑业;制约因素;Grey-DEMATEL
Abstract:The paper identifies thirteen major constraints on the implementation of the EPC model in China’s construction industry through literature research,expert interviews,and questionnaire surveys. Uses the GreyDEMATEL method to conduct causal relationships and importance studies on each constraint,and make sensitivity analysis. The results show that the incomplete laws and regulations related to EPC,and the mismatch between the requirements of engineering consulting and EPC general contracting are the causal factors,owner’s will is the result factor,the lack of complex talents and management teams under the EPC model is the key constraint. On the basis,uts forward relevant measures and suggestions to promote its implementation.
Keywords:EPC model;construction industry;constraint;Grey-DEMATEL
参考文献
[1] Huse J A. Understanding and negotiating Turnkey and EPC 李辉山,等·我国建筑业推行EPC模式制约因素分析contracts[M]. London:Sweet & Maxwell,2002.
[2] 孙继德,傅家雯,刘姝宏.工程总承包和全过程工程咨询的结合探讨[J].建筑经济,2018(12):5-9.
[3] 周茂强.制约我国建设方采用EPC总承包模式的原因与对策[J].中国标准化,2017(12):81-82.
[4] 吕彦朋.我国EPC工程总承包存在的问题与对策研究[D].北京:中国铁道科学研究院,2019.
[5] 孙建国.EPC总承包模式中存在的问题及措施[J].神华科技,2017(8):8-11.
[6] 郑宝春.试析EPC工程总承包项目推进难点[J].福建建材,2018(10):106-107+112.
[7] 高龙,徐永洪,胡婧,等.EPC总承包管理模式运用过程中的问题及对策[J].化工管理,2018(35):16-17
[8] 王铁钢.EPC总承包模式实施效果评价与对策[J].华侨大学学报(自然科学版),2017(2):169-174.
[9] 周德群.系统工程方法与应用[M].北京:电子工业出版,2015.
[10] 王笑含.建筑施工质量控制的障碍因素分析[D].天津:天津大学,2016.
建筑经济,2020(10):13-19

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!