摘要:工程变更签证费用的确定是实现总承包工程费用有效管控的重要环节。围绕工程变更签证计列,系统梳理工程方面的现有相关依据性规章制度文件,借鉴不同基建行业的实务计列方法,统计电力总承包工程变更签证的类型与内容,分类别、分原则地分析和优化电力总包工程变更签证费用标准,方便公司费控人员更好的开展费控工作、把握签证费用审核的标准,提高费控人员的专业化能力、强化对分包商的成本控制能力,提高总承包项目的精益化费用管控水平。
关键词:总承包;电力工程;变更签证费用
Abstract:The cost determination of engineering visa is an important link to realize the effective control of general contract project cost. Around the calculation of engineering visa,this paper combs systematically the existing rules and regulations related to the project,draws lessons from the actual determination methods of different capital construction industries,analyzes and optimizes the cost standard of power contract engineering visa by classification and principle,which helps cost control personnel carrying out fee control work and grasping the standard of visa cost audit. The research results of this paper contribute to enhancing the professional ability of cost control personnel,strengthening the cost control ability of subcontractors,and improving the lean cost control level of general contracting projects.
Keywords:EPC;power engineering;engineering visa建筑经济,2020(08):61-64