您现在的位置:建筑经济>>往期回顾>2020年>第7期>>文献要素
基于LC-BIM的装配式建筑建造流程管理研究
李天新 李忠富 李丽红 李龙
(1.大连理工大学建设管理系,辽宁 大连 116024;2.沈阳建筑大学管理学院,辽宁 沈阳 110168)
文献要素

摘要:在分析装配式建筑建造流程碎片化问题成因的基础上,分别阐释精益建造和BIM对碎片化的改进作用,界定各自的侧重点,并对精益建造和BIM的交互支撑作用进行讨论,论述精益建造和BIM集成的适宜性,由此提出基于LC-BIM的装配式建筑建造流程管理框架,以期系统性解决流程碎片化问题,推动装配式建筑的可持续发展。
关键词:装配式建筑;精益建造;BIM;流程碎片化
Abstract:Based on the cause analysis of the fragmentation of the prefabricated building construction process,this paper explains the improvement effects of lean construction and BIM on fragmentation,identifies their respective advantages. Furthermore,discusses the interactive support of lean construction and BIM,which fully proved that they are suitable for integration. Finally,proposes the LC-BIM based prefabricated building construction process management framework to systematically solve the process fragmentation issues and promote the sustainable development of prefabricated buildings.
Keywords:prefabricated building;lean construction;BIM;process fragmentation
参考文献
[1] 申金山,华元璞,袁鸣.装配式建筑精益成本管理研究[J].建筑经济,2019(3):45-49.
[2] Li X,Li Z,Wu G. Lean precast production system based on the CONWIP method[J]. KSCE Journal of Civil Engineering,2018(7):2167-2177.
[3] Bamana F,Lehoux N,Cloutier C. Simulation of a construction project:Assessing impact of Just-in-Time and lean principles[J]. Journal of Construction Engineering and Management,
2019(5).
[4] 齐宝库,李长福.基于BIM的装配式建筑全生命周期管理问题研究[J].施工技术,2014(15):25-29.
[5] 郭红领,潘在怡.BIM辅助施工管理的模式及流程[J].清华大学学报(自然科学版),2017(10):1076-1082.
[6] 刘旭红,武飞.基于BIM技术的建筑产业链自动化流程研
究[J].建筑经济,2018(12):101-105.
[7] Yu H,Al-Hussein M,Al-Jibouri S,etal. Lean transformation in a modular building company:A case for implementation[J]. Journal of management in engineering,2011(1):103-111.
[8] 林树枝,施有志.基于BIM技术的装配式建筑智慧建造[J].建筑结构,2018(23):118-122
[9] Dahmas S,Li Z,Liu S. Solving the difficulties and challenges facing construction based on concurrent engineering in Yemen[J]. Sustainability,2019(11):3146.
[10] Tayeh B A,Al Hallaq K,Zahoor H,etal. Techniques and benefits of implementing the last planner system in the Gaza Strip construction industry[J]. Engineering,Construction and Architectural Management,2019(7):1424-1436.
[11] Al Hattab M,Hamzeh F. Using social network theory and simulation to compare traditional versus BIM-lean practice for design error management[J]. Automation in Construction,2015,52:59-69.
[12] Mahalingam A,Yadav A K,Varaprasad J. Investigating the role of lean practices in enabling BIM adoption:Evidence from two Indian cases[J]. Journal of Construction Engineering and Management,2015(7).
[13] Koseoglu O,Sakin M,Arayici Y. Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project[J]. Engineering,Construction and Architectural Management,2018(10):1339-1354.
[14] Heigermoser D,de Soto B G,Abbott E L S,etal. BIM-based Last Planner System tool for improving construction project management[J]. Automation in Construction,2019,104:246-254.
[15] Sacks R,Koskela L,Dave B A,etal. Interaction of lean and building information modeling in construction[J]. Journal of Construction Engineering and Management,2010(9):968-980.
[16] Li L,Li Z,Li X,etal. A Review of Global Lean Construction during the Past Two Decades:Analysis and Visualization[J]. Engineering Construction and Architectural Management,2019(6):192-216.
建筑经济,2020(7):38-42

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!