您现在的位置:建筑经济>>往期回顾>2020年>第4期>>文献要素
基于ISM的预制构件生产风险因素分析
刘妍 黎倩倩 姚福义 纪颖波
(1.北方工业大学土木工程学院,北京 100144;2.重庆大学管理科学与房地产学院,重庆 400044)
文献要素
摘要:在文献研究和实地调研访谈的基础上,应用扎根理论将预制构件生产的风险因素归纳为4个方面:技术风险因素、组织管理风险因素、经济风险因素和人员风险因素;并引入解释结构模型(ISM)理论,分析风险因素间的相互关系,构建预制构件生产风险因素ISM模型。模型将风险因素划分为五级,可概括为直接影响因素、间接影响因素和根本影响因素三类,且针对根本影响因素提出具体的风险管控措施,以期提高预制构件的生产效率。
关键词:预制构件;生产效率;风险管理;扎根理论
Abstract:On the basis of literature research and field research interviews,this paper summarizes the risk factors of prefabricated component production into four aspects based on grounded theory,including technical risk factors,organizational management risk factors,economic risk factors,and personnel risk factors. Then,analyzes the relationship between risk factors by introducing the theory of Interpreted Structural Model(ISM),and constructs a risk factors ISM model of prefabricated component production. The model divides risk factors into five levels,which can be summarized into three categories:direct influence factors,indirect influence factors,and fundamental influence factors. Finally,proposes specific risk management and control measures for the fundamental influence factors to improve production efficiency of the prefabricated component.
Keywords:prefabricated component;production efficiency;risk management;grounded theory
参考文献
[1] Jin,R. Y,Gao,S,Cheshmehzangi,A,etal. A holistic review of off-site construction literature published between 2008 and 2018[J]. Journal of Cleaner Production,2018(8):1202-1219.
[2] Jiang,R. Mao,C,Hou,L,etal. A SWOT analysis for promoting off-site construction under the backdrop of China's new urbanization[J]. Journal of Cleaner Production,2018(6):225-234.
[3] 刘大胜,蒋勤俭,黄清杰,等.预制混凝土构件工厂全国重点区域规划布局研究[J].混凝土与水泥制品,2019(9):60-65.
[4] 杨仕文,徐霞,王森.装配式混凝土建筑产业链关键节点及产业发展驱动力研究[J].企业经济,2016(6):123-127.
[5] Haitao Yu,Mohamed Al-Hussein,M.ASCE,etal.Lean transformation in a modular building company:A case for implementation[J].Journal of management in engineering,2013(1):103-111.
[6] Mana  Moghadam,Mohamed Al-Hussein. Resource optimization for modular construction through value stream map improvement[J].Production System Design,2014(2):144-154.
[7] Khalili A,Chua D K . Integrated prefabrication configuration and component grouping for resource optimization of precast production[C]//Bios Europe. International Society for Optics and Photonics,2014.
[8] 安然,周东明,张彦欢,等.基于BIM和RFID技术的PC建筑全生命周期应用研究[J].工程建设,2017(11):24-27.
[9] 胡珉,陆俊宇.基于RFID的预制混凝土构件生产智能管理系统设计与实现[J].土木建筑工程信息技术,2013(3):50-56.
建筑经济,2020(4):116-120
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!