您现在的位置:建筑经济>>往期回顾>2020年>第4期>>文献要素
基于BIM技术的PPP项目全生命周期绩效评价研究—以保障房项目为例
蒋慧杰 尹航 杨中保 王元鸷
(1.深圳职业技术学院,广东 深圳 518055;2.天津大学,天津 300072;3.深圳市栋森工程项目管理有限公司,广东 深圳 518081)
文献要素
摘要:构建基于BIM技术的PPP项目全生命周期绩效评价模型,将各阶段的绩效评价串联起来。然后以国内某保障房项目为例,从项目识别与准备、项目采购以及项目执行等3个环节,介绍基于BIM的PPP绩效评价模型应用,进而确保PPP项目绩效评价的有效展开。
关键词:PPP;BIM;全生命周期;保障房
Abstract:This paper constructs the full life cycle performance evaluation model of PPP project based on BIM technology to link the performance evaluation of each stage. Then,taking an affordable housing project in China as an example,introduces the application of PPP performance evaluation model based on BIM from three aspects:project identification and preparation,project procurement and project execution,so as to ensure the effective implementation of PPP project performance evaluation.
Keywords:PPP;BIM;full life cycle;affordable housing
参考文献
[1] National Audit Office. The termination of the PFI contract for the national physical laboratory[EB/OL].http://www.official-documents.gov.uk/document/hc0506/hc10/1044/1044.pdf.
[2] SONG J,HU Y,FENG Z. Factors influencing early termination of PPP projects in China[J]. Journal of Management in Engineering,2018(1). 
[3] 杨宝昆,刘芳.PPP项目全生命周期绩效管理研究[J].工程经济,2018(3):23-30.
建筑经济,2020(4):40-45
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!