运用PERT技术合理确定项目建设投资研究
张曦
(福州市规划设计研究院,福建 福州 350108)
文献要素
摘要:为合理确定项目建设投资,避免“三超”现象发生,在剖析传统统一固定费率制计算项目基本预备费的缺点和局限性基础上,提出以合理确定基本预备费取费基数中各项费用金额为基础,充分考虑其置信等级和置信区间,结合PERT技术采用个别浮动制方式计算项目基本预备费及确定费率。
关键词:建设;费率;投资;计划评审技术;基本预备费
Abstract:In order to reasonably determine the investment for the construction of a project and to avoid the occurrence of the phenomenon of “three excesses”,and on the basis of an analysis of the shortcomings and limitations of the traditional unified fixed rate system for calculating the basic reserve cost of a project,this paper proposes to reasonably determine the amount of various expenses in the basic reserve fee withdrawal base. Taking into account the confidence level and confidence interval of the various costs,the basic preparation cost of the project is calculated and the rate is determined by individual floating method combined with PERT technology.
Keywords:construction;rate;investment;program evaluation and review technique;basic reserve cost
参考文献
[1] 胡新萍、王芳.工程造价控制与管理[M].北京:北京大学出版社,2018.
[2] 中华人民共和国交通运输部.JTG3820-2018公路工程基本建设项目投资估算编制办法[S].北京:人民交通出版社股份有限公司,2019.
[3] 国家铁路局.TZJ3002-2018铁路基本建设工程投资估算预估算费用定额[S].北京:中国铁道出版社,2019.
[4] 钟庆平.基于蒙特卡洛模拟的基本预备费估算[J].煤炭技术,2011(10):123-125.
[5] 侯学良,杨颖蓉,李越.基于蒙特卡洛模拟的电网建设工程基本预备费测算[J].电力建设,2014(9):109-113.
[6] 徐源.蒙特卡洛模拟在项目基本预备费估算中的应用研究[D].天津:天津大学,2016.
[7] 王刚.谈建设项目预备费的确定方法[J].技术经济与管理研究,2002(3):107-108.
[8] 赵振宇,杨华春,邢玫,等.一种确定建设项目风险预备费的新方法——风险分析估算法(ERA)[J].基建优化,2002(2):25-27.
[9] 赵淑红,郑青,陆诗文.风险分析方法在估算投资项目预备费中的应用[J].石油化工技术与经济,2010(2):12-14+33.
[10] 耿鹏云,齐霞,尹冰冰,等.输变电工程基本预备费费率测算模式与方法研究[J].陕西电力,2015(10):58-61.
[11] 方简.基于PERT技术的建设项目进度控制研究——以上海国际金融中心项目为例[J].建筑经济,2019(1):73-76.
建筑经济,2020(2):56-62
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!