基于熵权TOPSIS的工程咨询机构BIM技术应用能力评价
(郑州大学土木工程学院,河南 郑州 450001)
- 文献要素
-
摘要:构建工程咨询机构BIM技术应用能力评价的指标体系,提出改进的熵权TOPSIS评价模型,以4个典型的工程咨询单位为例,进行BIM技术运用能力评价。研究表明,BIM行业的整体水平已经有了明显的提升,但是区域间的发展还存在一定差距。关键词:工程咨询机构;熵权TOPSIS模型;BIM技术;应用能力Abstract:This paper establishes the evaluation indicator system of BIM technology application capability. Then,proposes the improved entropy weight TOPSIS model. Finally,takes four typical engineering consulting agencies as examples to evaluate their application ability of BIM technology. The results show that the overall level of the BIM technology application capability has been significantly improved,however,there are still some gaps in the development of BIM technology between different regions.Keywords:engineering consulting agency;entropy weight TOPSIS model;BIM technology;application ability参考文献[1] Azhar,Salman. Building information modeling(BIM):trends,benefits,risks,and challenges for the AEC industry[J]. Leadership and Management in Engineering,2011(3):241-252.[2] 王贵林.工程咨询中BIM技术的应用[J].住宅与房地产,2018(12):210.[3] Howard R,Bj?rk,Bo Christer. Building information modelling - Experts’ views on standardisation and industry deployment[J]. Advanced Engineering Informatics,2008(2):271-280.[4] 黄雨晴,徐照,王广斌,谭丹.BIM成熟度模型研究综述[J].建筑经济,2018(12):115-120.[5] 王天伟,李向东.建筑施工企业BIM应用能力评价指标体系研究[J].科技管理研究2018(6):48-53.[6] 李凌洋,李晨阳.基于扎根理论的BIM工作室能力标准构建研究[J].建筑经济,2019(3):105-109.[7] 黄园.建设项目BIM应用成熟度评价研究[D].深圳:深圳大学,2017.[8] 刘秋常,韩涵,李慧敏,郭磊.基于熵权TOPSIS法的海绵城市建设绩效评价——以河南省鹤壁市为例[J].人民长江,2017(14):23-26.[9] 于晓明.建筑企业BIM应用能力评估体系研究[J].施工技术,2017(12):113-118.[10] 董娜,胡琳璐,邹琢晶,等.基于C-OWA算子和灰色聚类的业主驱动下BIM应用效益评价[J].科技管理研究,2019(4):48-54.[11] Aydogan E. K. Performance measurement model for Turkish aviation firms using the rough-AHP and TOPSIS methods under fuzzy environment[J]. Expert Systems with Applications,2011(4):3992-3998.[12] Zhang K. Z.,Shen J. Q.,Han H. Urban river health analysis of the Jialu River in Zhengzhou City using the improved fuzzy matter-element extension model[J]. Water,2019(6):1-22.[13] 雷勋平,Robin Qiu,刘勇.基于熵权TOPSIS模型的区域土地利用绩效评价及障碍因子诊断[J].农业工程学报,2016(13):243-253.建筑经济,2020(1):104-109