摘要:基于对进度管理和关键路径法内涵和原理的剖析,深入探索进度管理实践过程。针对进度计划的制定和更新维护过程,以关键路径的确定及动态管理为核心,从多方面分析影响进度计划可靠性的各类因素,阐述其影响机制并分别给出实践指导,为实现精细化项目管理提供支撑。
关键词:项目管理;进度管理;进度计划;关键路径;CPM
Abstract:This paper deeply explores the schedule management practice based on the analysis of the connotation and principle of schedule management and critical path method. For the developing,updating and maintenance process of the schedule,the various factors affecting the reliability of the schedule are analyzed from different aspects with the critical path determination and dynamic management as the core. Moreover,the effects of those factors on schedule are expounded and the schedule management practice standards are given respectively,which will support the refined project management.
Keywords:project management;schedule management;schedule;critical path;CPM
参考文献
[1] 任振,沈敏圣,王成程.改进挣值法在大型科研项目进度——成本管理的应用[J].科技管理研究,2016(20):211-214.
[2] 王静,曾莎洁,琚娟.资源受限项目调度模型的施工进度管
理[J].同济大学学报(自然科学版),2017(10):1561-1568.
[3] 路强,毛龙龙,等.项目管理中任务时间进度不确定性可视
化[J].计算机辅助设计与图形学学报,2018(6):1055-1064.
[4] 刘洋,吴凤亮,李德辉.珠澳大桥岛隧工程施工计划与进度控制管理[J].公路,2018(8):132-134.
[5] PMI(Project Management Institute). Practice standard for scheduling[M]. 2nd ed. Maryland:Project Management Institute Inc.,2011.
[6] PMI(Project Management Institute). A guide to the Project Management Body of Knowledge(PMBOK)[M]. 6th ed. Maryland:Project Management Institute Inc.,2017.
建筑经济,2019(9):67-71