您现在的位置:建筑经济>>《工程经济》往期回顾>2019年>第8期>>文献要素
基于D-S证据理论的水电工程投资风险研究
聂元东
(上海勘测设计研究院有限公司,上海 200335)
文献要素
摘要:基于工程实践分析与专家信息调研,归纳出技术风险、环境风险、经济风险、管理风险等4类一级风险因素,设计技术标准、设计技术成熟度等28个二级风险因素,构建投资风险评估指标体系。利用D-S证据理论,建立投资风险评估模型,并结合最大隶属度原则拟定投资风险评估等级。实例验算表明:该水电站项目投资风险适中,可以适当修正投资方案后投资。
关键词:水电工程;投资风险;风险评估;D-S证据理论
Abstract:Based on the analysis of engineering practice and the investigation of expert information,this paper summarizes four types of first-level risk factors,including technical risk,environmental risk,economic risk and management risk,28 second-level risk factors,including design technical standard and design technology maturity,and constructs the index system of investment risk assessment. Then,establishes investment risk assessment model by using D-S evidence theory,and draws up investment risk assessment grade according to the maximum membership principle. Examples shows that the investment risk of hydropower station project is moderate and the investment plan can be properly revised.
Keywords:hydropower engineering;investment risk;risk assessment;D-S evidence theory
参考文献
[1] 国家发改委,国家能源局.能源生产和消费革命战略(2016-2030)[S].发改基础〔2016〕2795号,2016.
[2] 徐玖平,李姣.大型水利水电工程建设项目动态联盟组织模式的结构集成[J].系统工程理论与实践,2012(11):2447-2458.
[3] 顾跃,王荫清,林峋,等.投资风险的度量及其对决策方法的影响[J].数量经济技术经济研究,1992(5):27-31.
[4] 温鹏,匡尚富,贾仰文.基于目标约束的政府水利投资风险评估体系[J].中国水利水电科学研究院学报,2009(4):239-245.
[5] Liu D H,Song H L. Risk analysis and comprehensive evaluation of risks in EPC hydropower engineering[J]. Water Sciences & Engineering Technology,2010.
[6] 袁宏川,游佳成,贺骏.基于云模型的水利PPP项目投资风险评价[J].水电能源科学,2017(8):141-144.
[7] 龙云.铁路项目施工过程投资控制要点探讨——基于技术措施视角[J].建筑经济,2018(02):58-61.
[8] 彭振武,李开孟,徐成彬.当前我国普遍采用的以整体风险等级为导向的项目稳评框架问题剖析[J].技术经济,2013(12):70-76+103.
[9] Xue Y F. Analysis on investment risk of Hydropower project[J]. Applied Mechanics & Materials,2013:405-408.
[10] 刘领,凌玉标.水电建设项目风险评估与防范[J].水力发电,2003(11):1-2+13.
[11] 陈广洲,汪家权,李如忠,等.基于D-S证据理论的水利工程招标评价[J].水力发电学报,2012(3):263-266.
工程经济,2019(8):23-26
下载地址