EPC工程实施中的界面管理研究
(1.山东省土木工程防灾减灾重点实验室,山东 青岛 266590;2.山东科技大学土木工程与建筑学院,山东 青岛 266590)
- 文献要素
-
摘要:从集成单元的性状和存在形态角度出发,对EPC项目实施中的实体界面、组织界面、合同界面、技术界面以及责任界面进行系统分析,构建界面划分模型,并结合模型分析各界面管理中的要点、方法以及界面融合的策略。最后,进行界面识别,从设计、采购、施工、试运行的全过程视角构建出完整的EPC工程管理界面体系,期望对EPC工程的实施具有一定的理论指导意义和工程应用价值。关键词:EPC工程;界面管理;合同界面;组织界面;技术界面;责任界面Abstract:From the perspective of the traits and existing forms of the integrated unit,this paper systematically analyzes the physical interface,organizational interface,contract interface,technical interface and responsibility interface in the implementation of EPC project,constructs related models,and analyzes the key points in each interface management,methods and strategies for interface integration with the model. Finally,identifies the interface,from the perspective of design,procurement,construction,commissioning,builds a complete EPC project management interface system,hopes to have certain theoretical guiding significance and engineering application value for EPC project implementation.Keywords:EPC engineering;interface management;contract interface;organizational interface;technical interface;responsibility interface参考文献[1] Wenxin Shen,Byungjoo Choi,etc.How to Improve Interface Management Behaviors in EPC Projects:Roles of Formal Practices and Social Norms[J].2018(6).[2] 范磊磊.基于界面管理的设计型EPC造价风险因素识别分析[J].建筑经济,2018(10):86-89.[3] 杨卫东,吕晓磊,等.大型建设工程实体界面控制研究[J].项目管理技术,2013(12):72-75.[4] 高胜媛,李希胜,章帅.基于SEM的EPC项目内部组织界面满意度研究[J].人民长江,2018(8):92-96.[5] 石林林.EPC水利项目组织界面有效性评价[J].人民黄河,2017(4):122-126.[6] 何晗芝,贺洁,魏嘉,等.界面管理在大型建设项目EPC总承包方设计管理中的应用[J].施工技术,2017(6):138-142.建筑经济,2019(6):52-55