建设项目合同治理的衡量与现状-基于业界的问卷调查与案例研究
梁永宽 袁静
(1.中山大学, 广东 广州 510275;2.广东外贸外语大学, 广东 广州 510420)
文献要素
[摘 要] 合同是项目管理的核心,衡量合同治理分解为项目合同的明确性、适应性和履行严格性三个维度,分别对应着合同的全过程控制。通过对项目管理者的调查分析,结合案例研究,表明在目前的项目管理中,已经建立了全面的合同管理意识,项目合同条款详尽明确,符合具体项目的特点,能满足项目管理的需要,但对项目实施过程中的严格性仍存在不同的理解,对索赔和变更的灵活程度更高。
[关键词] 项目管理;合同治理;调查;案例;研究
Abstract: The contract is the core of project management. Project contractual governance emphasizes three dimensionalities: the clarity of the contract, adaptability and implement strictly. These are corresponding with the process of contract controlling. The survey for the project managers and case study, shows that it has been established the comprehensive awareness about contracts in the project management presently. The contractual terms are clear, fitting to the characteristics of specific projects and could meet the needs of project management. However, there is the different understanding about administering contract strictly in the project implementation process. There are more flexibility on claim and changing.
Key words: project management; contractual governance; investigation; case; study
[参考文献]
[1]W. Wang, K Hawwash, J Perry. Contract type selector(CTS): a KBS for training young engineers[J]. International Journal of Project Management, 1996(14):95-102.
[2]S. Floricel, R. Miller.Strategizing for anticipated risks and turbulence in large scale engineering projects [J]. International Journal of Project Management, 2001(19):445-455.
[3]P.A. Thompson, J.G.Perry. Contract strategy in the 1990s[A].Proceedings of the 9th World Congress on Project Management Glasgow, 1988(9): 54-62.
[4]J.R. Turner, S.J. Simister. Project contract management and a theory of organization[J]. International Journal of Pro-
ject Management, 2001 (8): 457-464.
[5]J. Hinze, J. Tada. General provisions critical to construction contracts [J]. Power Engineering,1993(2):38.
[6]A.A. Bubshait, S.A. Almohawis. Evaluating the general conditions of a construction contract[J]. International Journal of Project Management,1994(12):133-136.
[7]周定山,孟宪海.工程合同文件缺陷索赔及案例[J].建筑经济,2003(3):41-44.
[8]胡季英,关柯.我国建设工程合同管理存在的问题及对策探讨[J].建设监理,2003(4):29-30.
[9]邱闯.国际工程合同中业主违约下的损害赔偿[J].建筑经济,2001(1):22-24.
[10]Genus. Managing large-scale technology and inter-organizational relations: the case of the Channel Tunnel [J]. Research Policy,1997(26):169-189.
[11]P. Bajari, S. Tadelis. Incentives versus transaction costs: a theory of procurement contracts [J]. Rand Journal of Economics,2001(3):387-407.
[12]Y. Luo. Transactional characteristics,institutional environment and joint venture contract[J]. Journal of International Business Studies,2005(12):209-230.
[13]J.R. Turner, R. Müller. On the nature of the project as a temporary organization[J]. International Journal of Project Management, 2003(21):1-7.
[14]梁永宽,汪建成.委托代理理论下的项目治理机制[J].建筑经济,2009(5):83-86. 
[15]王兴敏.积极推行EPC总承包,提高工程建设管理水平[J].中国勘察设计,2001(8):13-15.
建筑经济,2009(12):24-27
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!