材料暂估价引起的风险分担问题研究
王美华 李栋
(1.天津理工大学管理学院,天津 300384;2.天津市经特建设工程咨询有限公司,天津 300074)
文献要素

摘要:材料暂估价作为工程量清单重要组成部分,在工程实践中成为纠纷和合同争议的焦点。从风险分担的角度出发,依据相关研究和实际案例应用ABC分类法和标准差系数法等界定适合采用暂估价的材料类型,并从甲供材和甲定乙供两个方面对比分析材料暂估价引起的风险分担问题,为材料暂估价引起的价款调整提供参考依据。
关键词:工程量清单;材料暂估价;风险分担;案例分析
Abstract:Material prime cost sum is an important part of the engineering quantity list,which has become the focus of issues and contract disputes in engineering practice. From the perspective of risk sharing,this paper uses ABC classification method and standard deviation coefficient method to define the types of materials suitable for temporary valuation based on relevant research and actual cases,and compares the analysis materials about the risk sharing from two aspects of suppling materialby employer and suppling by contractor after determining by employer,in order to provide reference for the adjustment of the price caused by the temporary valuation of materials.
Keywords:engineering quality list;material prime cost sum;risk sharing;case analysis
参考文献
[1] 吴振全.建设工程暂估价若干问题的探讨[J].工程经济,2016(2):5-9.
[2] 杨楠,申琪玉.大型复杂项目施工阶段造价控制研究[J].建筑经济,2017(9):40-44.
[3] 严云成,翟宝珍.浅议建设项目暂估价材料的有关问题[J].中国工程咨询,2014(11):62-63.
[4] 王晓妮.暂估价形式的招标问题探讨[J].绿色科技,2016(5):184-185.
[5] 丁井余.政府投资建设项目暂估价招标及标后实施存在的问题及建议[J].招标与投标,2015(7):31-32.
[6] 曹小菊,李建峰.基于新规范中甲供材的结算和抵扣研究[J].价值工程,2015(12):14-15.
工程经济,2019(2):14-18

下载地址