基于PERT技术的建设项目进度控制研究—以上海国际金融中心项目为例
方简
(上海建科工程咨询有限公司,上海 200032)
文献要素
摘要:突破以往PERT模型中工期必须符合正态分布的传统思路,提出工期符合概率分布P的假设。在此基础上,以上海国际金融中心项目进度控制为例,分解调整项目工序的逻辑关系,将三时法运用到PERT方法中,计算得出对定目标的实现概率,并调整优化得到可实现性强的项目工期排布,为应用较多新工艺的复杂项目进度控制提供参考。
关键词:工期;PERT技术;进度计划;工程项目
Abstract:This paper breaks through the traditional idea that the time limit in the PERT model must conform to the normal distribution,and puts forward the hypothesis that the time limit conforms to the probability distribution P. On this basis,takes the project schedule control of Shanghai international financial center as an example,firstly decomposes and adjusts the logical relationship of the project process,applies the three-time method to the PERT method,calculates and obtains the probability of achieving the given goal,then adjusts and optimizes,and finally gains the time schedule of the project with strong realizability,provides reference for the progress control of complex projects with more new technologies.
Keywords:time limit;PERT technology;schedule plan;engineering project
参考文献
[1] 潘广钦.项目管理中的CPM\PERT和CCPM的比较研究[J].科学实践,2010(10):36-44.
建筑经济,2019(1):73-76
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!