价格变化下PPP项目残值风险预测研究
(1.东南大学土木工程学院,江苏 南京 210096;2. 华发股份南京公司,江苏 南京 211100)
- 文献要素
-
摘要:分析PPP项目价格变化对项目残值风险的影响,并将PPP项目残值风险分解为经济价值残值风险和社会价值残值风险,构建价格变化下的残值风险计算模型。在此基础上,以香港西遂项目为案例,运用时间序列理论,预测价格影响因素的变化,进而对残值风险进行预测,验证该模型的有效性。关键词:PPP模式;残值风险;价格变化;风险预测Abstract:The paper analyzes the effect of projects’ price change on PPP projects,decomposes residual-value risk in PPP project into economic value residual risk and social value residual risk,and constructes a prediction framework of PPP projects’ residual-value risk. On the basis,takes Hongkong Xisui project as an example,predicts the changes of price influencing factors with time series analysis,and predicts the residual-value risk,to prove the effectiveness of the model.Keywords:PPP mode;residual-value risk;price changes;risk prediction参考文献[1] 熊伟.特许经营期末PPP项目残值风险评估研究[D].南京:东南大学,2011.[2] 戴大双,宋金波. BOT项目特许决策管理[M]. Dashuang Dai,Jinbo Song译. 北京:电子工业出版社,2010.[3] Li Bing. The allocation of risk in PPP/PFI construction projects in the UK. International Journal of Project Management,2005(1):25-35.[4] 李静华. PPP项目产品/服务的定价模型及实证分析[D].南京:东南大学,2008.[5] 汪文雄.城市交通基础设施PPP项目产品/服务价格模型研究[D].南京:东南大学,2008.[6] 宋金波,宋丹荣,王东波.泉州刺桐大桥BOT项目的运营风险[J].管理案例研究与评论,2009(3):196-201.[7] 周望军.收费公路的定价问题研究[J].宏观经济研究,2002(5):42-45.[8] 范征,黄为一,卢文娜.工程融资模式探讨:以德黑兰地铁三号线为例[J].国际经济合作,2007(7):78-82.[9] 季闯.基于范例推理的PPP项目残值风险动态评估研究[D]. 南京:东南大学,2012.建筑经济,2019(1):51-57