您现在的位置:建筑经济>>往期回顾>2009年>第11期>>文献要素
工程量清单列项安排的价值分析
高平
(东北财经大学投资工程管理学院工程管理研究中心, 辽宁 大连 116025)
文献要素
[摘 要] 在价值管理讨论的基础上,详细分析了工程量清单价值要素和各种清单功能列项安排,提出了清单列项安排的价值体系,并对一些列项安排的价值进行了详细分析。
[关键词] 工程量清单;价值管理;功能;列项安排
Abstract: On the basis of discussion of value managemt,the paper analyzes the value elements of bills of quantities and the items formats of various bills function, provides value system of bills items arrangement, analyzes the value of some items arrangement in detail.
Key words: bills of quantities; value management; function; formats of bills of quantities
[参考文献]
[1]Kodikara G, Thorpe A, Mc Caffer. The use of bills of quan-
tities in building contractor organizations[J]. Construction
Management and Economics,1993,11(4): 261-269.
[2]Dallas M. Value and risk management: a guide to best practice [M]. Oxford: Blackwell Science,2006.
[3]Dell'Isola A. Value engineering[M].R.S Means,1997.
[4]The AQUA Group.Tenders and contracts for building[M].3th ed.Oxford: Blackwell Science, 1999.
[5]Hackett M, et al. Pre-contract practice and contract administration[M].Oxford: Blackwell Science,2003:96,100.
[6]Nelson J.Construction information[J]. Building Technology
and Management,1970,8:3-5.
[7]Brook M. Estimating and tendering for contruction work[M]. 4th ed. Oxford:Butterworth-Heinemann,2008:54,118.
[8]Ferry D, Brandon P, Ferry J. Cost planning of buildings[M]. 7th ed. Oxford: Blackwell Science,1999:125,118.
[9]Jaggar D. et al. Building design cost manangement[M]. Oxford: Blackwell Science, 2002:8,58,4.
[10]Charette R, Marshall H.UNIFORMATⅡ elemental classi-
fication for building specifications, cost estimating, and cost analysis[EB/OL]. Tchnology Administration of US Depart-ment of Commerce,1996(10).www.fire.nist.gov/bfrlpubs/build99/PDF/b99080.pdf.25.
[11]Davis P,Love P,Baccarini D. Bills of Quantities: nemesis or nirvana?[J]. Structural Survey, 2009, 27(2): 99-108.
[12]Edwards J, Edwards M. A price-rationalised appro-
ach to item separation in the measurement of concrete work[J]. Construction Management and Economics,1995, 13(6): 485-491. 
[13]Barnes N.The long and the short of it[J]. Building,1988, Feb:32-33.
[14]高萍莉.工程量清单计价模式应用过程中相关问题研究[D].重庆:重庆大学建设管理与房地产学院,2007.
[15]Poh P, Horner R.Cost-significant modelling- its potential for use in south-east Asia[J]. Engineering Construction and Architectural Management,1995, 2(2): 121-139.
建筑经济,2009(11):74-78
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!