国际PPP项目争议成因及对策分析—基于多案例研究
牛耘诗 褚晓凌 冯珂 王守清
(1.清华大学建设管理系,北京 100084;2.清华大学恒隆房地产研究中心,北京 100084)
文献要素
摘要:国际PPP项目的争议发生频繁,了解争议发生的原因对于我国企业实施国际PPP项目投资具有重要的意义。搜集15个具有代表性的国际PPP项目,总结其发生争议的原因和争议的解决方式,并从招投标阶段、建设阶段和运营阶段对15个案例的争议成因进行梳理,以及从财务问题、社会问题和合作关系问题三个方面分析争议造成的后果,最后基于多案例分析提出规避和解决国际PPP项目争议的建议。
关键词:PPP项目;争议;成因;对策;多案例
Abstract:Disputes in international PPP projects occur frequently,and it is important for Chinese enterprises to figure it out why disputes occur,which will help them to make investment decisions in international PPP projects. This paper collects 15 representative projects and concludes the reasons and resolutions for disputes in these projects,analyzes the reasons from various stages of tendering,construction and operation. Then,analyzes the consequences caused by disputes from perspectives of finance,society and partnership. Based on these multiple case studies,puts forwards some suggestions which could be useful for avoiding and resolving disputes.
Keywords:PPP;dispute;reason;resolution;multiple case
参考文献
[1] 张水波,郭富仙.基于风险视角的国际PPP项目投标决策模型研究[J].工程管理学报,2013(5):59-63.
[2] 冯珂,王守清,伍迪,等.基于案例的中国PPP项目特许权协议动态调节措施的研究[J].工程管理学报,2015(3):88-93.
[3] 孙慧,叶秀贤.不完全契约下PPP项目剩余控制权配置模型研究[J].系统工程学报,2013(2):227-233.
[4] Guasch J L,Laffont J-J,Straub S. Renegotiation of concession contracts in Latin America:Evidence from the water and transport sectors[J].International Journal of Industrial Organization,2008(2):421-442.
[5] 孙慧,孙晓鹏,范志清.PPP项目中再谈判关键影响因素的研究[J].国际经济合作,2010(3):58-61.
[6] 刘婷,赵桐,王守清.基于案例的我国PPP项目再谈判情况研究[J].建筑经济,2016(9):31-34.
[7] 王守清,柯永建.特许经营项目融资[M].北京:清华大学出版社,2008.
建筑经济,2018(09):59-63
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!