- 文献要素
-
摘要:外海沉管隧道计价体系涉及多个专业领域,技术复杂,创新工艺多,施工装备要求高,大型专用设备投入多,施工风险大,是一个复杂的系统。分析外海沉管隧道的特征与其计价需求,系统开展主要子目及专业划分,然后从专业定额选用、定额修编、补充定额等方面展开定额研究,实施计价体系模型构建。最后以沉管主体结构和沉管接头处理子目作为主要案例,系统说明有关应用情况与效果。
关键词:沉管隧道;外海;计价体系;定额
Abstract:The valuation system for immersed tube tunnel is a complex system,involving many specialized fields,complicated technology,many innovative technology,high requirement for construction equipment,large investment in large special equipment and large construction risk. This paper analyzes the characteristics of immersed tube tunnel in the sea and the valuation demand,defines the main subcategories and specialized fields. Then,carries out quota research from aspects such as the selection of the professional quota,the revision of the quota,and the supplementary quota,implement the construction of the valuation system model. Last,provides a case study by analyzing the main structure of the immersed tube and the subdivision of the immersed tube joint,exemplifies applications and the result of the system.
Keywords:immersed tunnel;open sea;valuation system;quota
参考文献
[1] 陈越.沉管隧道技术应用及发展趋势[J].隧道建设,2017(4):387-393.
[2] 张志刚,刘洪洲.公路沉管隧道的发展及其关键技术[J].隧道建设,2013(5):343-347.
[3] 张劲文,朱永灵.港珠澳大桥主体工程建设项目管理规划[J].公路,2012(3):143-147.
[4] 中交公路规划设计院有限公司联合体.港珠澳大桥主体工程初步设计文件[R].2009.
[5] 中交公路规划设计院有限公司联合体.港珠澳大桥主体工程岛隧工程施工图设计文件[R].2012.
[6] 陈韶章,苏宗贤,陈越.港珠澳大桥沉管隧道新技术[J].隧道建设,2015(5):396-403.
[7] 徐国平,苏权科,李贞新,刘洪洲.外海超长沉管隧道设计关键技术研究[J].公路,2015(4):1-7.
[8] 高星林,张鸣功,方明山,戴建标.港珠澳大桥工程创新管理实践[J].重庆交通大学学报(自然科学版),2016(S1):
12-26.
[9] 广东省交通运输工程造价管理站,港珠澳大桥管理局.外海桥梁、隧道工程定额研究工作报告[R].2017.
[10] 广东省交通运输厅.广东省沿海沉管隧道、人工岛工程预算补充定额(试行)[Z].2017-01-13.
建筑经济,2018(07):87-91