新建经营性PPP项目公私双方合作稳定性影响因素研究
潘鹏程 玄立颖 陈红帅
(燕山大学,河北 秦皇岛 066004)
文献要素

摘要:PPP项目合作周期长、投资大、不确定因素多,公私双方合作稳定性受到各种因素的影响。界定PPP项目公私双方合作关系稳定性内涵,通过案例分析、文献归纳两种方式初步确定影响公私双方合作稳定性的影响因素;进而简化、补充、归纳,分别得到规划设计阶段、建设阶段、运营阶段的26个影响因素,为政府部门和私营部门维持稳定的合作关系提供参考。
关键词:PPP项目;合作关系:稳定性;影响因素
Abstract:PPP project has long cooperation period,large investment and uncertain factors in the process. The stability of the cooperation between public and private parties is affected by various factors. This paper defines the stability connotation of PPP cooperation between public and private parties,determines preliminary the factors influencing the stability of public-private cooperation by case study and literature summarization. Then obtains respectively 26 influencing factors of the planning and design stage,the construction stage and the operation stage by simplifying,supplementing and inducing,in order to provide references for keeping a stable cooperation between public and private parties.
Keywords:PPP project;cooperation;stability;influencing factor
参考文献
[1] 财政部.全国PPP综合信息平台项目库2016年第三季
报[EB/OL].(2016-09-30)http://www.cpppc.org:8082/efmisweb/ppp/projectLivrary/toPPPMap.do.
[2] World Bank Group. Private Participation in Infrastructure Database[EB/OL].(2015-12-15)http://ppi.worldbank.org/customquery.
[3] 铭鼎人咨询.国内外九个PPP项目失败案例及评价[J].水工业市场,2015(10):51.
[4] 中国水网.长春汇津污水处理有限公司诉长春市人民政府案一审结案[EB/OL].(2004-01-12)http://www.h2o-china.com/news/24409.html.
[5] Xu Jiang,Yuan Li,Shanxing Gao. The stability of strategic alliances:Characteristics,factors and stages[J]. Journal of International Management,2008(14):173-175.
[6] 亓霞,柯永建,王守清.基于案例的中国PPP项目的主要风险因素分析[J].中国软件科学,2009(5):110-111.
[7] 澎湃新闻网.北京水十厂难产16年:第二个水务公私合营项目的中国命运[EB/OL].(2014-08-14)http://news.163.com/14/0814/16/A3KG0A1000014SEH.html.
[8] 财政部国际司.国际上PPP项目的失败案例[N].中国财经报,2017-07-22.
[9] 柯永建,王守清,陈炳泉.英法海峡隧道的失败对PPP项目风险分担的启示[J].土木工程学报,2008(12):97-102.
[10] 工业360.中法水务廉江触礁[EB/OL].(2011-09-04)http://jipaishui.gongye360.com/news_view.html?id=2600174.
工程经济,2018(05):66-70

下载地址