建设工程BIM协同管理影响因素及分析模型研究
陆荣欣
(上海建科工程咨询有限公司,上海 200032)
文献要素

摘要:BIM协同管理被业界广泛视为是提升建筑信息化管理水平和提高项目绩效的重要潜在手段。通过文献分析和问卷调查等,得出BIM协同管理影响因素主要包括组织、数据、过程、团队水平、资源等。然后阐述BIM协同管理的分析模型,并选取一新建项目为实例,论证该研究方法的有效性和实用性。
关键词:建设工程;BIM协同管理;影响因素;模糊数学模型
Abstract:BIM collaboration management has been widely regarded as a significant potential solution to improve the level of project information management and project performance. Through literature analysis and questionnaire survey,etc,this paper concludes that the influencing factors of BIM collaborative management mainly include organization,data,process,team level,resources. Then,expounds the analysis model of BIM cooperative management,and selects a new project as an example to demonstrate the effectiveness and practicability of the research method.
Keywords:construction project;BIM collaboration management;influencing factors;fuzzy mathematic model
参考文献
[1] 曹冬平.工程项目BIM应用行为的制度性驱动因素及绩效影响机制研究[D].上海:同济大学,2015.
[2] Won J,Lee G. How to tell if a BIM project is successful:A goal-driven approach[J]. Automation in Construction,2016,69:34-43.
[3] Tornatzky L G,Klein K J. Innovation characteristics and innovation adoption-implementation:A meta-analysis of findings[J]. IEEE Transactions on Engineering Management,1982(1):28-45.
[4] 余力,左美云.协同管理模式理论框架研究[J].中国人民大学学报,2006(3):68-73.
[5] 琚娟.基于BIM的设计施工跨阶段数据交换标准研究[J].土木建筑工程信息技术,2016(4):21-26.
建筑经济,2018(04):55-58

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!