摘要:技术措施的充分运用是节约铁路项目投资的重要抓手。针对铁路项目建设施工过程的投资控制,梳理、分析科学编制和优化建设组织方案、详细调查地质条件等五类控制技术措施,并结合具体项目实践,展示技术措施的具体应用及其效果,证明技术措施是建设实施阶段投资控制的基本途径和有效手段。
关键词:铁路建设;投资控制;技术措施;动态调整
Abstract:The application of technical measures is an important grasp for saving investment in railway project. In view of the investment control in the construction process of railway project,the paper combs and analyzes five kinds of technical measures named scientificly making and optimizing the organizational plans,carrying detailed investigation of geological conditions and so on. Combined with specific project practice,shows the specific application and effect of technical measures,proves that technical measures are basic ways and effective means for investment control in the implementation stage.
Keywords:railway construction;investment control;technical measures;dynamic adjustment
参考文献
[1] 段晓晨,张小平.我国铁路工程投资控制存在问题及成因分析[J].铁道建筑技术,2000(5):54-57.
[2] 铁道部.铁路基本建设项目投资控制管理办法(铁计〔2007〕97号文)[S].2007.
[3] 铁道部.铁路基本建设工程概预算编制办法(铁建设〔2006〕113号文)[S].2006.
[4] 房杏军.铁路基本建设项目概算清理环节投资控制探讨[J].城市建筑,2015(9):326-327.
[5] 吴学军.铁路工程设计阶段投资控制浅析[J].铁路工程技术与经济,2016(11):59-62.
[6] 姚亚峰,唐正光.设计阶段对投资控制的分析[J].公路,2012(9):154-158.
[7] 铁道部.铁路建设项目变更设计管理办法(铁建设〔2012〕253号文)[S].2012.
[8] 王亦军,胡毅.铁路建设项目投资管理研究[J].中国铁路,2016(10):21-34.
建筑经济,2018(02):58-61