摘要:传统的关键链进度预警由于计算量大、缺乏可视化管理平台,信息共享常发生偏差和滞后。通过构建基于BIM的关键链进度预警系统以解决上述问题,系统包括BIM模型管理、缓冲区监控和警度报告三个模块。通过将关键链中的缓冲区作为只消耗时间的任务插入进度计划,并在BIM模型中创建对应缓冲区图元,以构建4D BIM模型。利用信息采集技术自动采集实际进度数据,依据项目进展动态设置缓冲触发点,最后基于BIM模型进行二次开发,实现进度预警的可视化和集成化。
关键词:BIM;关键链;进度预警;缓冲区
Abstract:Due to the large amount of calculation and lack of visual platform,the sharing of information is often deviated and lagged for traditional schedule early warning of critical chain. This paper constructs the schedule early warning system of critical chain based on BIM,which can effectively solve the aforementioned problems. The system consists of three modules:BIM model management,buffer monitoring and alarm reporting. Then,inserts the buffer of critical chain into schedule as the task consuming time only,and creates the corresponding primitive buffer in the BIM model,so as to build the 4D BIM. Finally,collects actual schedule data by information collection technology,sets buffer trigger points dynamically according to the progress of the project,carries out the secondary development of the schedule early warning based on BIM model to realize the visualization and integration of the schedule early warning.
Keywords:BIM;critical chain;schedule early warning;buffer
参考文献
[1] Geekie A,Steyn H. Buffer sizing for the critical chain project management method[J]. South African Journal of Industrial Engineering,2012(1):73-88.
[2] 童杏娟,杜志达.基于PERT的关键链缓冲预警机制研究[J].价值工程,2010(7):60-61.
[3] 李南,戴育雷,杨莉.基于缓冲区和挣值分析的项目成本与进度风险预警[J].工程管理学报,2015(4):123-127.
[4] Zhang S,Teizer J,Lee J K,et al. Building Information Modeling(BIM)and safety:Automatic safety checking of construction models and schedules[J].Automation in Construction,2013(4):183-195.
[5] Kim C,Son H,Kim C. Automated construction progress measurement using a 4D building information model and 3D data[J]. Automation in Construction,2012(12):75-82.
[6] 王磊.基于BIM的工程项目进度预警研究[D].赣州:江西理工大学,2015.
[7] Leach L P. Critical chain project management[M]. London:Artech House,2000.
[8] 吉罗德·肯德尔,王仕斌.TOC制约法专题(二):关键链项目管理[J].企业管理,2007(5):62-67.
[9] 彭武良,王成恩.关键链项目调度模型及遗传算法求解[J].系统工程学报,2010(1):125-133.
[10] 张宁.工程总承包项目工期延误影响因素研究[D].天津:天津大学,2011.
[11] Song L,Eldin N. Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling[J].Automation in Construction,2012(6):32-39.
[12] Turkan Y,Bosche F,Haas C T,et al. Automated progress tracking using 4D schedule and 3D sensing technologies[J].Automation in Construction,2011(3):414-421.
建筑经济,2018(02):27-32