PPP项目政府方介入产生额外费用的计算与支付研究
王华 柯洪 杜亚灵 吕明
(1.天津理工大学管理学院,天津 300384;2.北京新机场建设指挥部,北京 102600)
文献要素

摘要:通过文献分析将PPP项目中政府方介入产生额外费用的确定,分解为项目公司未违约和项目公司违约两种情况进行:首先,依据现有文件梳理出适宜采取政府方介入的情形;其次,根据政府方介入流程将其产生的额外费用进行解构,并分别给出各部分费用的计算方法和依据;最后,通过整理并分析相关法律文件明确各种情况下政府方介入产生额外费用的承担方以及支付方式。
关键词:PPP项目;政府方介入;额外费用;承担方;支付方式
Abstract:The paper divides the determination of extra costs incurred during government intervention in PPP projects into two aspects through literature analysis,which are project company not defaulting and project company defaulting. Firstly,combs the situation in which the government can intervene appropriately according to the existing files. Secondly,deconstructs the extra costs according to the procedure of government intervention,and then gives the method and basis to calculate each part cost. Finally,clearly defines the undertaker and payment methods of extra costs incurred during government intervention in each case by sorting and analyzing relevant legal documents.
Keywords:PPP projects;government intervention;extra costs;undertaker;payment method
参考文献
[1] 财政部PPP中心.“中国PPP大数据”之全国PPP综合信息平台项目库季报(2017年第一季度)[N].中国经济周刊,2017-05-01.
[2] 成军帅.我国PPP项目的政府职能定位[J].河北青年管理干部学院学报,2016(4):41-46.
[3] 格里姆赛,刘易斯.公私合作伙伴关系:基础设施供给和项目融资的全球革命[M].北京:中国人民大学出版社,2007.
[4] 陈新松.《基础设施和公用事业特许经营管理办法》重点条文解读[J].上海煤气,2015(4):38-42.
[5] 常静.BOT项目提前终止责任分担的模糊决策模型研究[D].大连:大连理工大学,2014.
[6] 朱蕾,袁竞峰,杜静.基于PPP合同行政属性的政府介入权研究[J].建筑经济,2007(10):92-95.
[7] 韩利.公用事业领域实施临时接管措施的法律探究[J].城市管理与科技,2008(2):41-44.
[8] 章志远,李明超.公用事业特许经营中的临时接管制度研究——从“首例政府临时接管特许经营权案”切入[J].行政法学研究,2010(1):16-23.
[9] 赵颖.公用事业临时接管的法律分析[J].商业时代,2011(14):99-100.
[10] 朱秋蓉.公用事业特许经营合同中的行政特权研究[D].苏州:苏州大学,2011.
[11] 闫海,姜丽.市政公用事业特许经营的行政接管[J].城市问题,2011(6):2-7.
[12] 李明超.公用事业特许经营中的临时接管程序研究——从“内蒙古西乌旗政府临时接管民营热电企业案”切入[J].西南政法大学学报,2013(4):52-60.
建筑经济,2017(11):47-51