摘要:高铁项目施工技术要求高、周期长、规模大,施工中面临风险众多,需要对其风险进行科学管控。在建立高铁项目施工风险评价三级指标体系基础上,将模糊语义量化应用于CUOWGA算子,考虑风险间的相关性,用改进的CUOWGA算子和Shapley值函数对高铁项目施工风险指标体系进行评价。
关键词:高铁项目;施工风险;CUOWGA算子;Shapley值
Abstract:The high speed railway project construction with technology complexity,long cycle,large scale is faced with many risks,which need for scientific management and control of its risks. On the basis of establishing setting up the three level index system of risk assessment of high speed railway project construction,this paper applies the quantification of fuzzy semantics to the CUOWGA operator,considers the correlation between construction risks,and uses the improved CUOWGA operator and Shapley valued function to evaluate the index system of risk assessment.
Keywords:high speed railway project;construction risk;CUOWGA operator;Shapley value
参考文献
[1] 代春泉.城市隧道施工风险分析与控制技术研究[M].北京:清华大学出版社,2016.
[2] 任蓉.高速铁路对城市经济社会影响评价体系研究[J].工程经济,2016(8):52-56.
[3] 周荣喜,徐步祥,邱菀华,王新哲.ANP-BP铁路系统安全风险评估模型及应用[J].科技进步与对策,2014(11):90-95
[4] 唐俊虎.高铁施工风险管理和担保制度研究[D].天津:河北工业大学,2014.
[5] 李向楠.基于模糊群决策的高铁施工过程风险评价[D].北京:华北电力大学,2013.
建筑经济,2017(11):43-46