深基坑工程施工风险管理实务研究
周红波 高文杰
(1.上海建筑科学研究院<集团>有限公司, 上海 200032;2.上海建科建设监理咨询有限公司, 上海 200032)
文献要素

[摘 要] 通过对深基坑工程风险的分析,说明了实行风险管理的必要性。基于基坑工程特点,提出建立参建各方共同参与的风险管理组织架构,根据风险识别、评估、预控和跟踪控制四大管理任务分别设计了相应的工作流程和工作表格,并制定了包括专家评审制度的各项管理制度和基于控制论反馈思想的风险控制方法。然后选取某轨道交通换乘车站基坑工程进行试点,取得了良好的风险管理效果,验证了该风险管理体系的良好应用价值。
[关键词] 深基坑;风险管理;组织架构;控制论;反馈方法
Abstract: Firstly, the need for the implementation of risk management is proved by risk analysis for deep foundation pit. To build an organizational structure of risk management based on characteristics of deep foundation pit with all aspects involving is proposed, which is on basis of the effectiveness of risk management. Risk identification, assessment process, risk pre-control process, risk track control process and corresponding work list, are designed according to risk management tasks. And protecting disciplines including expert review, as well as risk control methods based on feedback of cybemetics are applied to protect the effectiveness of risk management. A foundation project of certain subway transaction stop is taken as an example. The results show that the risk management system proposed in this paper is effective, and its application value is proved as well.
Key words: deep foundation pit; risk management; organizational structure; gybernetics; feedback
[参考文献]
[1]黄宏伟,边亦海.深基坑工程施工中的风险管理[J].地下空间与工程学报,2005(4):611-613.
[2]陈玉平.基坑工程项目风险管理研究[D].上海:同济大学,2005.
[3]罗凤.深基坑工程风险管理研究[D].成都:成都理工大学,2008.
[4]刘翔,罗俊国,王玉梅.地铁深基坑工程风险管理研究[J].施工技术,2008,37(7):249-252.
[5]李永强,苏振民.PPP项目风险分担的博弈分析[J].基建优化,2005,26(5):16-18.
[6]梁青槐,贾俊峰.基于工程保险的土建工程施工安全风险管理模式研究[J].中国安全科学学报,2005,15(6):54-56.
[7]周红波,陆鑫,王挺.建筑工程质量安全风险管理模式研究和试点介绍[J].建筑经济,2005(11):29-32.
[8]韩传峰,王玉虎.工程建设项目风险分担管理模式系统分析[J].建筑经济,2007,298(8):68-70.
[9]维纳著,郝季仁译.控制论:或关于在动物和机器中控制和通信的科学[M].北京:北京大学出版社,2007.
建筑经济,2009(9):73-76

 

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!