您现在的位置:建筑经济>>《工程经济》往期回顾>2017年>第9期>>文献要素
BIM在建筑工程招投标阶段的造价管理应用—以浙江省观音圣坛主体项目为例
李雅琦 李猛
(1.山东协和学院,山东 济南 250107;2.中国建筑第八工程局有限公司总承包公司,上海 200135)
文献要素

摘要:近年来,BIM技术在大型建设项目推广应用,但多集中于设计阶段,很少在招投标阶段应用。以浙江省观音圣坛主体工程项目为例,阐述该项目在招投标造价管理中存在的难点,并从准确计算工程量、优化施工组织设计、实施可视化检查等角度,分析BIM在招投标阶段造价管理中的应用,以期为类似项目的BIM应用提供参考。
关键词:建筑工程;BIM;造价管理;招投标
Abstract:In recent years,BIM technology is applied in large-scale construction projects,but its applications are mostly concentrated in the design stage,and rarely applies in the bidding stage. Taking Zhejiang Guanyin altar main project as an example,this paper elaborates the problems existing in the cost management of project bidding,from the aspects of the accurate calculation of engineering quantity,optimizing the construction organization design and implementation of visual inspection,analyzes the BIM application of cost management in bidding stage,in order to provide references for similar projects.
Keywords:construction project;BIM;cost management;bidding
参考文献
[1] Dana K. Smith,Michael Tardif.Building Information Modeling-a strategic implementation guild for architects,engineers,constructors and real estate asset managers[M]. John Wiley & Sons,2009.
[2] 陈训.建设工程全寿命信息管理(BLM)思想和应用的研
究[D].上海:同济大学,2006.
[3] Mahmoud Halfawy,Thomas Froese. Component-based framework for implementing integrated architectural/engineering/construction project systems[J]. Journal of Computing in Civil Engineering,2007(6):59-64.
[4] 杨一凡.基于的工程项目成本控制分析[D].大连:大连理工大学,2014.
[5] 罗兰,彭中要.应用BIM技术制定装饰工程投标方案的方法研究[J].建筑经济,2016(5):39-42.
[6] Stanford University. CIFE(Center for Integrated Facility Engineering)[EB/OL].(2009-10-1)http://cife.stanford.edu/Publications/index.html.
工程经济,2017(09):12-14

下载地址