您现在的位置:建筑经济>>往期回顾>2017年>第9期>>文献要素
大型复杂项目施工阶段造价控制研究
杨楠 申琪玉
(1.华南理工大学土木与交通学院,广东 广州 510641;2.广东华工工程建设监理有限公司,广东 广州 510665)
文献要素

摘要:以某大型复杂项目KA为例,从建设单位角度分析该项目在施工阶段造价控制中存在的设计图纸不完善、专业工程暂估价难以准确编制、缺乏合同管理等难点。结合该项目特点,提出采用BIM技术完善设计图纸、完善专业工程暂估价预算调整方法及程序、成立专业小组加强合同管理等解决措施,为同类项目在施工阶段造价控制提供借鉴。
关键词:大型复杂项目;施工阶段;造价控制;合同管理
Abstract:Taking a large scale complex project KA as an example,this paper analyzes the difficulties of the cost control in construction phase from the view point of construction unit,including drawing designs are imperfect,project temporary valuation is difficult to accurately compile,contract management is lacking and so on. According to the features of this project,puts forward some concrete solutions to solve these issues such as adopting BIM technology to improve design drawings,perfecting the adjusting methods and procedures of temporary evaluation budget,setting up professional teams to strengthen the management of contracts,in order to provide some experience of cost control for the similar projects.
Keywords:large scale complex project;construction phase;cost control;contract management
参考文献
[1] 史长猛,李文远.《2013版施工合同》在某特大型项目造价管理上的应用研究与实践[J].招投标与造价,2016(1):45-47.
[2] 李丹枫.浅谈某大型项目全过程造价控制管理方法[J].广东土木与建筑,2011(3):62-64.
[3] 殷莺.某大型项目施工全过程造价控制实践[J].广东土木与建筑,2011(6):54-61.
[4] 住房和城乡建设部.GB50500-2013建设工程工程量清单计价规范[S].2013.
[5] 杨佳春.BIM技术及其对工程造价管理的影响[J].南通职业大学学报,2015(9):85-87.
[6] 全国招标师职业资格考试辅导教材指导委员会.招标采购专业实务[M].北京:中国计划出版社,2015.
建筑经济,2017(9):40-44

下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!