基于案例分析的PPP不成功项目失败历程及启示
(三亚学院,海南 三亚 572000)
- 文献要素
-
摘要:基于国内外案例,对PPP不成功项目进行分析研究,总结项目的失败历程,分析PPP项目失败的原因。在此基础上,提出完善政府、企业的定位,以及政府与企业间的关系等措施,为项目的成功运作提供保障。关键词:PPP项目;案例分析;失败历程;定位Abstract:Based on the case analysis of unsuccessful PPP projects at home and abroad,this paper summarizes the failure process of projects,and analyzes the causes of unsuccessful PPP projects. Then,puts forward some measures to perfect the positioning of the government and enterprises,as well as the relationship between the government and enterprises,in order to guarantee the success of the project operation.Keywords:PPP projects;case analysis;failure process;position参考文献[1] 张霞.十万亿PPP为何成了国企的盛宴[N].南方周末,2016-07-02.[2] Mohsin Ali Soomro,Xueqing Zhang.Roles of private-sector partners in transportation public-private partnership failures[J].Journal of Management in Engineering,2015(4)[3] 环卫科技网.国内外九个PPP项目失败案例及评价[EB/OL].(2015-08-12).http://huanbao.bjx.com.cn/new/20150812/652194-2.shtml.[4] 互联网.英吉利海峡隧道[EB/OL].(2016-08-07).http://www.92to.com/xuexi/2016/08-08/9313730.html.[5] 王茵.“加州91号快速路”的买路钱[N].南方周末,2015-02-13.[6] 李伟雄.港中旅特许经营风波[N].法制日报,2004-09-02.[7] 张霞.地方“激进版”vs“渐进版”万亿PPP里的诱惑与陷阱[N].南方周末,2016-02-12.建筑经济,2017(5):29-33