您现在的位置:建筑经济>>往期回顾>2017年>第4期>>文献要素
基于Shapley修正的房地产合作开发模式利益分配研究
廖奇云 王凯
(重庆大学建设管理与房地产学院,重庆 400045)
文献要素
摘要:房地产合作开发模式涉及多方利益主体,公平合理的利益分配方案可以促进各方相互协调配合,解决利益冲突,是合作项目成功运行的关键。基于合作对策问题的Shapley值求解方法,分析影响利益分配四种因素——努力程度、资金投入、无形资产、风险分摊,建立修正Shapley值的合作开发利益分配模型,并将模型应用到合作开发的工程实例中,验证其可行性和有效性。
关键词:房地产;合作开发;利益相关者;利益分配;Shapley值法
Abstract:Real estate cooperative development model involves multi-stakeholder,the fair and reasonable distribution program of benefits can promote the coordination of all parties to solve the conflict of interest,which is the key to the successful operation of cooperative projects. Based on Shapley value method of solving cooperative game problem,the paper analyzes the four factors that affect the distribution of benefits – effort degree,capital investment,intangible assets and risk sharing,and sets up the modified Shapley value method. Then,applies the model to the cooperative development of engineering examples to verify the feasibility and effectiveness.
Keywords:real estate;cooperative development;stakeholder;benefit distribution;Shapley value method
参考文献
[1] 王卫国.中国土地权利研究[M].北京.中国政法大学出版社,1997.
[2] 刘俊.房地产合作开发几个基本法律问题探讨[J].学术论坛,2007(2):136-140+166.
[3] 潘传勤.房地产合作开发法律问题研究——对一起房地产合作开发合同纠纷案的评析[J].福建政法管理干部学院学报,2005(1):111-115.
[4] 王洪平.论合作开发房地产中的物权认定与债务承担[J].山东社会科学,2012(6):10-15.
[5] 解志翔.房地产项目合作开发税务筹划研究[J].现代经济信息,2011(1):185.
[6] 刘冬明.宏观调控下的房地产项目合作开发税务筹划[J].企业导报,2009(11):175.
[7] 胡丽,张卫国,叶晓甦.基于SHAPELY修正的PPP项目利益分配模型研究[J].管理工程学报,2011(2):149-154.
建筑经济,2017(4):91-95
 
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!