多因素影响下的工期索赔计算原则研究
朱建国 沈杰
(东南大学土木工程学院, 江苏 南京 210096)
文献要素
[摘 要] 多因素影响下的工期索赔计算牵涉到三个重要问题:共同延误的索赔处理原则、网络计算的叠加和发散效应和时差的所有权。从共同延误的索赔处理原则入手,深入分析了网络计算叠加和发散效应产生的根本原因,探讨了时差所有权的归属问题。基于公平、简便和可操作性的考虑,提出了多因素影响下工期索赔计算的三个基本原则。
[关键词] 多因素;工期索赔;时差;叠加效应;发散效应
Abstract: Calculation of delay claims for project under multifactor affection concerns about three important problems: principle of concurrent delay claims, piling up and effect-weakening of network calculation, ownership of float times. Starting from principle of concurrent delay claims, this paper analyzes the basic reason for piling up and effect-weakening of network calculation, and discusses about who owns float times. Concerning about justice, convenience, and practicality, this paper brings about three main principles of delay claims for project under multi-factor affection.
Key words: multi-factor; delay claims; float time; effect piling up; effect weakening
[参考文献]
[1]梁鑑.国际工程施工索赔(第二版)[M].北京:中国建筑工业出版社,2002.
[2]杨德钦.多事件干扰下工期延误索赔原则研究[J].土木工程学报,2003(3).
[3]赛云秀,文艳芳,高宗祺.工期索赔值计算的动态分析法[J].西安科技学院学报,2002(12).
[4]郭汉丁,郑丕谔,郝海.工期索赔分析中网络计算的叠加和发散效应[J].西安建筑科技大学学报(自然科学版),2003(1).
[5]彭慧杰.施工索赔理论与方法研究[D].成都:西南交通大学,2003.
[6]姚小刚,凌传荣.多因素影响下工期索赔的复杂性[J].同济大学学报(自然科学版),2001(3).
建筑经济,2009(8):90-92
下载地址

    你还没注册?或者没有登录?这篇论文要求至少是本站的注册会员才能阅读!

    如果你还没注册,请赶紧点此注册吧!

    如果你已经注册但还没登录,请赶紧点此登录吧!