高校建设项目设计阶段造价控制方法探讨
(河南牧业经济学院,河南 郑州 450011)
- 文献要素
-
摘要:分析高校建设项目设计阶段存在的问题,提出采用审查设计方案,运用价值工程和限额设计原理优化设计方案,重视阶段设计成果审查,严控设计变更等措施加强对拟建项目设计阶段造价控制。以某高校二期学生公寓为例,说明设计阶段采用合适的工程造价控制方法,可以显著降低工程造价。关键词:设计阶段;造价控制;价值工程;限额设计;过程审查Abstract:This paper discusses the cost control methods in the design stage of construction projects in colleges and universities,analyzes the problems existing in the design stage,proposes relevant measures such as reviewing the design scheme,using the principles of value engineering and quota design,paying attention to review the stage design results,strictly controling design changes. Taking phase Ⅱ student apartment optimization scheme as an example,illustrates that the appropriate project cost control method used in the design phase can significantly reduce the cost of the project.Keywords:design stage;cost control;value engineering;quota design;process review参考文献[1] 张献萍,张义忠.建筑设计阶段控制工程造价的策略与方法[J].河南大学学报(自然科学版),2009(11).[2] 黄建瓯,张俊丽.全生命周期造价管理在建筑设计中的应用[J].建筑经济,2016(2).[3] 住建部.建筑工程设计文件编制深度规定[M].北京:中国计划出版社,2008.[4] 刘志飞.工程造价全生命周期的动态管理研究[J].建筑经济,2016(6).[5] 陈红,王白空.对开展施工图审查工作的认识和探讨[J].煤炭工程,2003(3).工程经济,2017(02):09-12